Your address
Reichenauer Straße 33a
6020 Innsbruck · Pradl
The LAGE score
This building
Modest · better than 31 % of all addresses in Innsbruck
The neighbourhood
An-der-Furt area · Modest · Innsbruck average: 61.
| Score | This building | Neighbourhood | Innsbruck |
|---|---|---|---|
| LQuietness | 39 | 67 | 75 |
| LAir quality | 48 | 48 | 44 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 37 | 41 | 55 |
| GNatural hazards | 85 | 85 | 85 |
| EEveryday amenities | 97 | 100 | 96 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 47 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 21 %
- Inside a 30- or 100-year flood area
- 8 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 6 %
- Distance to the nearest park or forest (average)
- 212 m
- Residents
- 599 · more densely populated than most of Innsbruck
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 1 more project within 1 km.
Further away, within 1 km (1)
-
Building Infrastruktur Conradstraße 2-12 - Baumeisterarbeiten846 m Contract awarded 22 May 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
From public tenders, the Freedom of Information register and environmental impact assessments. Innsbruck leaves construction sites and zoning procedures out of its open data, so smaller works may be missing. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Innsbruck → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 65–69 dB, rail 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Innsbruck Mitterhoferstraße, 1 min walk, every 4 min
- Frequent service (every 10 min or more often)
- Innsbruck Mitterhoferstraße, 1 min walk, every 4 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 2 min
- Doctor's practice
- 2 min
- Crèche
- 7 min
- Kindergarten
- 4 min
- Primary school
- 6 min
- Middle school
- 5 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 5 %
- Nearest park
- Grüngürtel Reichenau West, 4 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 25.6 / 11.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- within 50 m of a flood area
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 2,208 · about as densely populated as most of Innsbruck
- Who lives in the neighbourhood
- older residents than in most of Innsbruck; more older people; fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 4,455–6,031 (Innsbruck)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, state zoning plans (open data), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →