Your address

Adalbert-Stifter-Straße 69

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Leystraße / Adalbert-Stifter-Straße area, with 25 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 17 % of all addresses in Vienna

The neighbourhood

Leystraße / Adalbert-Stifter-Straße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 1787
LAir quality 32 3246
APublic transport 90 9090
GGreen space 60 6853
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
96 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
20 %
Distance to the nearest park or forest (average)
80 m
Residents
1,099 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 7 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (7)
  • New quarter Engerthstraße
    305 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
  • Building 20., Friedrich-Engels-Platz 17, Wehlistraße 32-38
    345 m Tendered · contract period 15 March 2027 – 15 December 2028 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34
    436 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Building 1210 Wien, Donauinselplatz 1 (Schulschiff) - Errichtung einer Photovoltaikanlage
    885 m Contract awarded 12 May 2026 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • New quarter Muthgasse 50
    914 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying
    964 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges 20., Jägerstraße 62-64, Stromstraße 14-16
    980 m Contract awarded · contract period 15 September 2025 – 3 May 2030 · end moved 687 days later since first listed Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 159194-2025)
    2. tender published (TED 258653-2025)
    3. tender published (TED 305702-2025)
    4. award published (TED 311376-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Leystraße, 1 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Leystraße, 1 min walk, every 4 min

On foot

Supermarket
1 min
Pharmacy
5 min
Doctor's practice
3 min
Crèche
5 min
Kindergarten
1 min
Primary school
1 min
Middle school
7 min
Playground
3 min

Green and air

Green and open land within 300 m
16 %
Nearest park
Forsthauspark, 2 min walk
Nearest forest
unnamed, 13 min walk
NO₂ / PM2.5, modelled 2022
30.5 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
5,269 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer older people

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →