Your address
Aignerstraße 14
1200 Wien · 20. Brigittenau
The LAGE score
This building
Modest · better than 24 % of all addresses in Vienna
The neighbourhood
Friedrich-Engels-Platz area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 17 | 17 | 87 |
| LAir quality | 42 | 32 | 46 |
| APublic transport | 78 | 90 | 90 |
| GGreen space | 80 | 74 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 99 | 99 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 76 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 74 %
- Green & open land within 300 m (average)
- 26 %
- Distance to the nearest park or forest (average)
- 182 m
- Protection zone (Schutzzone)
- 85 %
- Residents
- 4,567 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 9 more projects within 1 km.
Further away, within 1 km (9)
-
Zoning change Plandokument 8444: Gebiet zwischen Lorenz-Böhler-Gasse, Pasettistraße, Linienzug 1-3, Adalbert-Stifter-Straße, Lorenz-Müller-Gasse und Kornhäuselgasse384 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
New quarter Engerthstraße413 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Building 20., Friedrich-Engels-Platz 17, Wehlistraße 32-38415 m Tendered · contract period 15 March 2027 – 15 December 2028 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 1210 Wien, Donauinselplatz 1 (Schulschiff) - Errichtung einer Photovoltaikanlage693 m Contract awarded 12 May 2026 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
New quarter Muthgasse 50749 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34806 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Muthgasse 105861 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
-
Building Hochbauarbeiten - 1190 Wien, Muthgasse 107875 m Contract awarded 15 July 2025 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
New quarter Muthgasse 107-109A/B875 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- C
- Nearest stop
- Wien Aignerstraße, 4 min walk, every 10 min
- Frequent service (every 10 min or more often)
- Wien Aignerstraße, 4 min walk, every 10 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 4 min
- Doctor's practice
- 3 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 6 min
- Middle school
- 12 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 30 %
- Nearest park
- unnamed, 2 min walk
- Nearest forest
- unnamed, 9 min walk
- NO₂ / PM2.5, modelled 2022
- 27.4 / 11.4 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 4,833 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 3,569–5,058 (the Brigittenau district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →