Your address

Alserbachstraße 21

1090 Wien · 9. Alsergrund

The outline marks the neighbourhood Alserbachstraße area, with 57 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 14 % of all addresses in Vienna

The neighbourhood

Alserbachstraße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 6787
LAir quality 18 1846
APublic transport 100 10090
GGreen space 72 6553
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
40 % of addresses
Free of mapped noise ≥ 55 dB at the building
4 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
18 %
Distance to the nearest park or forest (average)
58 m
Protection zone (Schutzzone)
39 %
Residents
1,262 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 11 more projects within 1 km.

Further away, within 1 km (11)
  • Building 1090 Wien, Althanstraße 14- Entsorgung Mobiliar-Abbrucharbeiten
    177 m Contract awarded 30 September 2026 Source: Kerndaten (public tenders) · 5 records · checked 15 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. tender published (Kerndaten)
    5. tender published (Kerndaten)
  • Public transport ESTW Wien Franz-Josefs-Bahnhof, Errichtung Technikgebäude - Generalunternehmer, ESTW Wien Franz-Josefs-Bahnhof, Errichtung Technikgebäude
    251 m Contract awarded 30 April 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Public transport Althanstraße 21-25 bis Augasse und Newaldgasse track works
    344 m Under construction · works since 21 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1090 Wien, Althanstraße 14 / Augasse 2-6, Rückbau UZA 1 - Schadstoffentfrachtung Hörsäle
    469 m Contract awarded · contract period 7 January 2026 – 29 June 2029 · end moved 27 days later since first listed Source: TED (EU tenders) · 6 records · checked 12 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 644531-2025)
    2. award published (TED 24013-2026)
    3. tender published (TED 63634-2026)
    4. tender published (TED 113344-2026)
    5. tender published (TED 672864-2026)
    6. tender published (TED 682198-2026)
  • Public transport U5, 5. Ausbauphase
    510 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 1090 Wien, Sensengasse 2a-Universitätszahnklinik Wien - Schaden Akustikdecke- Baumeisterarbeiten
    561 m Contract awarded 26 May 2026 Source: Kerndaten (public tenders) · 16 records · checked 10 October 2026· Found automatically. Check with the source.
    History (16)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Dr. Eduard Kaufmann´sche Armenstiftung / Investorensuche zum Erwerb eines Baurechts
    603 m Contract awarded 7 November 2025 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 484350-2024)
    2. tender published (TED 626975-2024)
    3. award published (TED 739467-2025)
  • Building 1090 Wien, Michelbeuerngasse 6-10, HLMW 9, Abbrucharbeiten
    616 m Contract awarded 24 September 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1090 Wien, Bergg. 11, Sanierung ehem. Konditorei - EG - Baumeisterarbeiten
    811 m Contract awarded 17 February 2026 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Building 20., Treustraße 61-69
    867 m Contract awarded · contract period 2 March 2026 – 2 April 2028 Source: TED (EU tenders) · 8 records · checked 14 October 2026· Found automatically. Check with the source.
    History (8)
    1. tender published (TED 216940-2022)
    2. award published (TED 472916-2022)
    3. tender published (TED 666724-2024)
    4. tender published (TED 699498-2024)
    5. tender published (TED 711235-2024)
    6. award published (TED 616730-2025)
    7. tender published (TED 603680-2026)
    8. tender published (TED 691881-2026)
  • New quarter Obere Donaustraße 23-29
    877 m Approved 2022 Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Franz-Josefs-Bahnhof, 4 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Franz-Josefs-Bahnhof, 4 min walk, every 2 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
1 min
Crèche
3 min
Kindergarten
2 min
Primary school
4 min
Middle school
6 min
Playground
3 min

Green and air

Green and open land within 300 m
22 %
Nearest park
Liechtensteinpark, 1 min walk
Nearest forest
unnamed, 2 min walk
NO₂ / PM2.5, modelled 2022
34.6 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
4,905 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna

Prices

Apartments, average €/m² by building age
€ 4,750–6,404 (the Alsergrund district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →