Your address

Apollogasse 10

1070 Wien · 7. Neubau

The outline marks the neighbourhood Apollogasse area, with 58 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 21 % of all addresses in Vienna

The neighbourhood

Apollogasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 39 3987
LAir quality 20 1346
APublic transport 100 10090
GGreen space 48 5253
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
74 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
11 %
Distance to the nearest park or forest (average)
144 m
Protection zone (Schutzzone)
16 %
Residents
1,123 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building 07., Apollogasse
    275 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
  • Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau
    303 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 465942-2026)
    2. tender published (TED 487766-2026)
    3. tender published (TED 490200-2026)
    4. tender published (TED 496163-2026)
    5. tender published (TED 593204-2026)
    6. tender published (TED 704637-2026)
  • Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten
    608 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
    History (12)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus
    661 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building KH BHS - MR - Baumeister
    683 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 523155-2026)
    2. tender published (TED 523852-2026)
    3. tender published (TED 525201-2026)
  • Public transport U2, 4. Ausbauphase
    710 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Public transport Kirchengasse 1 bis 30 U-Bahn construction
    723 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works
    727 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10
    729 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges Burggasse 67 road works
    762 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1070 Wien, Neustiftgasse 95-99, Dämmung oberste Geschoßdecke - Baumeisterarbeiten
    821 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Roads and bridges 6., Windmühlgasse u.a.
    853 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 451515-2026)
    2. tender published (TED 518208-2026)
    3. award published (TED 672839-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Stollgasse, 3 min walk, every 7 min
Frequent service (every 10 min or more often)
Wien Stollgasse, 3 min walk, every 7 min

On foot

Supermarket
1 min
Pharmacy
3 min
Doctor's practice
2 min
Crèche
1 min
Kindergarten
1 min
Primary school
3 min
Middle school
5 min
Playground
3 min

Green and air

Green and open land within 300 m
11 %
Nearest park
Sophienpark, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
25.9 / 11.0 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,011 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,849–6,214 (the Neubau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →