Your address
Balderichgasse 22
1170 Wien · 17. Hernals
The LAGE score
This building
Fair · better than 41 % of all addresses in Vienna
The neighbourhood
Balderichgasse area · Good · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 39 | 67 | 87 |
| LAir quality | 39 | 39 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 58 | 62 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 34 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 2 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 19 %
- Distance to the nearest park or forest (average)
- 131 m
- Residents
- 2,005 · more densely populated than most of Vienna
Building works and projects nearby
1 new station is planned within walking distance. 7 more projects within 1 km.
New stations nearby
-
Public transport New station Hernals (U5)179 m U5, 5. Ausbauphase · Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
Further away, within 1 km (7)
-
Public transport Linie 10: Hernals70 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building WSC I Generalunternehmerleistungen +359 m Contract awarded 4 December 2025 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 100126-2024)
- award published (TED 836051-2025)
-
Pipes and cables Wien 16., /17., Sandleiteng. # Nietzschepl. über Güpferlingstr. b. Alszeile # Grünbeckweg + 17., Alszeile v. # Güpferlingstr. b. # Alsg. – Wasserrohrausw.684 m Tendered · contract period 11 January 2027 – 30 November 2027 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 716974-2026)
- tender published (TED 717965-2026)
-
Building Transportrohrstrang 5. HL-BA02 PH01 DN/ID 800 - 1170 Wien, Wattgasse - Lidlgasse 1-7774 m Tendered · contract period 23 February 2026 – 1 September 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 798007-2025)
- tender published (TED 839822-2025)
- tender published (TED 108964-2026)
- tender published (TED 158861-2026)
-
Pipes and cables Lidlgasse 1 bis 7 pipe laying790 m Under construction · works since 13 July 2026, planned until 17 September 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Wien 16., Mildeplatz # Seitenberggasse bis 17., Richthausenstraße # Wattgasse - Rohrlegerarbeiten885 m Contract awarded · contract period 4 June 2024 – 11 December 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
History (8)
- tender published (TED 163869-2024)
- tender published (TED 165439-2024)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (TED 329782-2026)
- tender published (TED 401304-2026)
- award published (TED 508346-2026)
- award published (Kerndaten)
-
Building Errichtung Sicherheitsbeleuchtung, Amtshaus, 1160 Wien, Wilhelminenstraße 93912 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · checked 12 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 65–69 dB, rail 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Hernals, 2 min walk, every 2 min
- Frequent service (every 10 min or more often)
- Wien Hernals, 2 min walk, every 2 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 3 min
- Doctor's practice
- 2 min
- Crèche
- 7 min
- Kindergarten
- 3 min
- Primary school
- 3 min
- Middle school
- 7 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 16 %
- Nearest park
- Dr.-Josef-Resch-Platz, 2 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 28.4 / 10.9 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 5,643 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 3,760–5,687 (the Hernals district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →