Your address

Boerhaavegasse 8A

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Klimschgasse / Schützengasse area, with 38 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 47 % of all addresses in Vienna

The neighbourhood

Klimschgasse / Schützengasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 8787
LAir quality 27 2746
APublic transport 90 9090
GGreen space 50 5153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
16 % of addresses
Free of mapped noise ≥ 55 dB at the building
10 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
9 %
Distance to the nearest park or forest (average)
118 m
Protection zone (Schutzzone)
26 %
Residents
1,010 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 projects reach this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Pipes and cables Wien 3., Landstraßer Hauptstraße von Schlachthausgasse bis Juchgasse - Wasserrohrauswechslung - Rohrlegerarbeiten
    318 m Contract awarded · contract period 28 April 2026 – 13 April 2027 Source: TED (EU tenders), Kerndaten (public tenders), data.gv.at (information requests) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 140941-2026)
    2. tender published (TED 141271-2026)
    3. award published (IFG)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • New quarter Landstraßer Hauptstraße 128
    336 m Approved 2026 Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges Landstraßer Hauptstraße von Emmerich-Teuber-Platz und Juchgasse und Apostelgasse bis Schlachthausgas road works
    338 m Under construction · works since 9 March 2026, planned until 31 August 2027 Source: Stadt Wien, TED (EU tenders) · 9 records · checked 16 October 2026
    History (3)
    1. tender published (TED 760400-2025)
    2. award published (TED 94160-2026)
    3. listed by the city
  • Building 1030 Wien, Ungargasse 69, Baumeisterarbeiten 2023
    355 m Contract awarded 21 April 2026 Source: Kerndaten (public tenders) · 30 records · checked 10 October 2026· Found automatically. Check with the source.
    History (30)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Public transport Rennweg von 33A bis 37 track works
    365 m Under construction · works since 30 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Landstraßer Hauptstraße 138 - Landstraßer Schlössl
    395 m Approved 2026 Source: Stadt Wien · checked 16 October 2026
  • Zoning change Plandokument 8412: Gebiet zwischen Landstraßer Hauptstraße, Oberzellergasse, Klimschgasse und Eslarngasse
    428 m Zoning in progress 10 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)
    448 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building 1030 Wien, Rennweg 14 - Gewächshaus, Zufahrt EPO - Baumeisterarbeiten
    596 m Contract awarded 19 May 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building Stadt Wien - Wiener Wohnen - 03., Khunngasse 20 - Baumeister
    610 m Contract awarded 1 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
    History (6)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
  • Building 1030 Wien, Otto Preminger Straße/Landstraße Hauptstraße, Neubau, AHS, Voraushub BF 17
    622 m Contract awarded · contract period 9 September 2024 – 20 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 47 records · checked 10 October 2026· Found automatically. Check with the source.
    History (47)
    1. award published (TED 197249-2026)
    2. award published (TED 197688-2026)
    3. award published (TED 204192-2026)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (TED 356472-2026)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • New quarter 03., Village im Dritten
    664 m Planned · developer competition 2021 · 711 flats Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Klinik Landstraße, 2 min walk, every 20 min
Frequent service (every 10 min or more often)
Wien Kleistgasse, 4 min walk, every 5 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
2 min
Primary school
3 min
Middle school
7 min
Playground
2 min

Green and air

Green and open land within 300 m
8 %
Nearest park
unnamed, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
31.9 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,820 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer older people

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →