Your address
Bonygasse 22
1120 Wien · 12. Meidling
The LAGE score
This building
Fair · better than 54 % of all addresses in Vienna
The neighbourhood
Hilschergasse / Vivenotgasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 95 | 87 | 87 |
| LAir quality | 31 | 31 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 43 | 46 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 10 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 48 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 8 %
- Distance to the nearest park or forest (average)
- 168 m
- Residents
- 608 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 10 more projects within 1 km.
Further away, within 1 km (10)
-
Building Generalunternehmerleistungen, AH 12., Theresienbadgasse 3378 m Contract awarded · contract period 20 January 2026 – 25 May 2028 · end moved 170 days later since first listed Source: TED (EU tenders), data.gv.at (information requests), Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 490323-2025)
- award published (TED 439326-2026)
- award published (Kerndaten)
- award published (IFG)
- award published (IFG)
-
Building Totalunternehmerleistungen für die Sanierung der städtischen Wohnhausanlage Migazziplatz 8-9, 1120 Wien409 m Contract awarded 14 February 2025 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 450507-2024)
- award published (Kerndaten)
- award published (TED 105071-2025)
-
Pipes and cables Schönbrunner Straße von 247 bis 257 sewer works448 m Under construction · works since 5 July 2026, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Linie 15: Wienerbergtangente525 m Planned Source: Stadt Wien · 14 records · checked 16 October 2026
-
Public transport Flurschützstraße von Kreuzung Aßmayergasse und Wilhelmstraße bis Kreuzung Längenfeldgasse track works554 m Under construction · works since 5 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Aßmayergasse 56 bis 74 track works598 m Under construction · works since 11 October 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)614 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Building GU Baumeisterarbeiten, Berufsschule 1120 Wien, Längenfeldgasse 13-15619 m Contract awarded · contract period 26 May 2025 – 1 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
History (18)
- award published (TED 480164-2025)
- award published (Kerndaten)
- tender published (TED 58925-2026)
- tender published (TED 103387-2026)
- award published (TED 317420-2026)
- award published (Kerndaten)
- award published (TED 329842-2026)
- award published (Kerndaten)
-
Building 12., Am Fuchsenfeld 1-3, Stiegen 4, 11, 12 und 24834 m Contract awarded · contract period 6 October 2025 – 17 February 2028 · end moved 64 days later since first listed Source: TED (EU tenders) · 26 records · checked 10 October 2026· Found automatically. Check with the source.
History (26)
- award published (TED 167517-2025)
- award published (TED 169080-2025)
- award published (TED 172085-2025)
- award published (TED 241803-2025)
- award published (TED 391947-2025)
- award published (TED 536484-2025)
- tender published (TED 849893-2025)
- award published (TED 530507-2026)
-
Building 1120 Wien, Am Europlatz 1-5 -Errichtung PV-Anlage946 m Contract awarded 15 October 2025 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- below 55 dB
- Quiet side
- –
Getting around
- Public transport class
- A
- Nearest stop
- Wien Niederhofstraße, 3 min walk, every 2 min
- Frequent service (every 10 min or more often)
- Wien Niederhofstraße, 3 min walk, every 2 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 2 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 1 min
- Primary school
- 5 min
- Middle school
- 7 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 7 %
- Nearest park
- Christine-Busta-Park, 3 min walk
- Nearest forest
- unnamed, 11 min walk
- NO₂ / PM2.5, modelled 2022
- 30.8 / 11.3 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 6,945 · very densely populated for Vienna
- Who lives in the neighbourhood
- fewer children
Prices
- Apartments, average €/m² by building age
- € 3,573–5,225 (the Meidling district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →