Your address
Bruno-Marek-Allee 24B
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Fair · better than 66 % of all addresses in Vienna
The neighbourhood
Bruno-Marek-Allee area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 75 | 75 | 87 |
| LAir quality | 32 | 32 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 74 | 64 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 22 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 16 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 99 %
- Green & open land within 300 m (average)
- 19 %
- Distance to the nearest park or forest (average)
- 75 m
- Residents
- 15,764 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying231 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau498 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten499 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 281451-2024)
- award published (TED 492315-2024)
-
Building 20., Nordwestbahnhof – Phase A.2544 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29560 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter 20., Nordwestbahnhof – Phase A.1568 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)583 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (TED 375124-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
-
Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St611 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
Zoning change Nordbahnhof-Innstraße618 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Nach öffentlicher Auflage
-
Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure622 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten651 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse651 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- tender published (TED 587888-2024)
- award published (TED 326240-2026)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- rail 55–59 dB
- Quiet side
- no
Getting around
- Public transport class
- B
- Nearest stop
- Wien Krakauer Straße, 1 min walk, every 6 min
- Frequent service (every 10 min or more often)
- Wien Krakauer Straße, 1 min walk, every 6 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 5 min
- Doctor's practice
- 3 min
- Crèche
- 4 min
- Kindergarten
- 2 min
- Primary school
- 5 min
- Middle school
- 6 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 23 %
- Nearest park
- Freie Mitte Parkband 1, 1 min walk
- Nearest forest
- unnamed, 10 min walk
- NO₂ / PM2.5, modelled 2022
- 30.4 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 7,150 · very densely populated for Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more children; fewer older people
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →