Your address

Colloredogasse 15

1180 Wien · 18. Währing

The outline marks the neighbourhood Colloredogasse area, with 116 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 41 % of all addresses in Vienna

The neighbourhood

Colloredogasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 8787
LAir quality 24 2446
APublic transport 90 9090
GGreen space 50 4053
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
19 % of addresses
Free of mapped noise ≥ 55 dB at the building
3 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
88 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
205 m
Protection zone (Schutzzone)
100 %
Residents
558 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 6 more projects within 1 km.

Further away, within 1 km (6)
  • Pipes and cables 19., Schegargasse 13-15, Stiegen 9, 10, 16 und 17
    583 m Contract awarded · contract period 15 June 2025 – 1 April 2027 Source: TED (EU tenders) · 21 records · checked 10 October 2026· Found automatically. Check with the source.
    History (21)
    1. award published (TED 773382-2024)
    2. award published (TED 39086-2025)
    3. award published (TED 46078-2025)
    4. award published (TED 63626-2025)
    5. award published (TED 78144-2025)
    6. award published (TED 172904-2025)
    7. award published (TED 417339-2025)
    8. award published (TED 523742-2025)
  • Zoning change Schulgasse 27
    792 m Zoning in progress · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Vor Genehmigt
  • Building 1090 Wien, Althanstraße 14- Entsorgung Mobiliar-Abbrucharbeiten
    948 m Contract awarded 30 September 2026 Source: Kerndaten (public tenders) · 5 records · checked 15 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. tender published (Kerndaten)
    5. tender published (Kerndaten)
  • Public transport U5, 5. Ausbauphase
    954 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building Wien 18., Schöffelgasse # Gersthofer Straße bis 19., Obkirchergasse # Sieveringer Straße - Erd- u. Baumeisterarbeiten
    972 m Contract awarded · contract period 28 February 2025 – 31 December 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 745473-2024)
    2. tender published (TED 746227-2024)
    3. tender published (TED 26396-2025)
    4. tender published (TED 28088-2025)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
  • Building 1180 Wien, Klostergasse 25, Funktionssanierung und Erweiterung AHS Klostergasse, Baumeisterarbeiten
    978 m Contract awarded · contract period 1 September 2024 – 30 October 2026 · end moved 183 days later since first listed Source: TED (EU tenders) · 22 records · checked 10 October 2026· Found automatically. Check with the source.
    History (22)
    1. tender published (TED 110884-2025)
    2. award published (TED 233865-2025)
    3. tender published (TED 381244-2025)
    4. tender published (TED 429755-2025)
    5. award published (TED 500364-2025)
    6. award published (TED 500427-2025)
    7. award published (TED 635578-2025)
    8. award published (TED 635897-2025)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Währinger Park, 4 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Währinger Park, 4 min walk, every 3 min

On foot

Supermarket
4 min
Pharmacy
3 min
Doctor's practice
2 min
Crèche
8 min
Kindergarten
4 min
Primary school
7 min
Middle school
8 min
Playground
4 min

Green and air

Green and open land within 300 m
11 %
Nearest park
Währinger Park, 2 min walk
Nearest forest
unnamed, 10 min walk
NO₂ / PM2.5, modelled 2022
33.0 / 11.2 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
1,563 · about as densely populated as most of Vienna
Who lives in the neighbourhood
more children

Prices

Apartments, average €/m² by building age
€ 4,470–5,735 (the Währing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →