Your address

Columbusgasse 73

1100 Wien · 10. Favoriten

The outline marks the neighbourhood Muhrengasse / Columbusgasse area, with 82 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 58 % of all addresses in Vienna

The neighbourhood

Muhrengasse / Columbusgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 6787
LAir quality 32 3246
APublic transport 100 10090
GGreen space 47 4653
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
42 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
7 %
Distance to the nearest park or forest (average)
122 m
Residents
1,638 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Public transport Baumeisterleistungen für den Aus- u. Umbau Halle 4 u.5 - Bahnhof Favoriten -
    617 m Tendered · contract period 11 January 2027 – 11 May 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 495267-2026)
    2. tender published (TED 531585-2026)
    3. tender published (TED 554478-2026)
  • Building Stadt Wien - Wiener Wohnen - 10., Friesenplatz 1-2 - Baumeister
    708 m Contract awarded · contract period 5 August 2024 – 1 November 2027 · end moved 995 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 36 records · checked 10 October 2026· Found automatically. Check with the source.
    History (36)
    1. award published (Kerndaten)
    2. award published (TED 148035-2025)
    3. award published (Kerndaten)
    4. award published (TED 310710-2025)
    5. award published (Kerndaten)
    6. tender published (TED 701413-2025)
    7. award published (Kerndaten)
    8. award published (TED 373598-2026)
  • Roads and bridges Favoritenstraße von Kreuzung Landgutgasse bis Kreuzung Keplerplatz und Keplergasse road works
    716 m Under construction · works since 19 April 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1100 Wien, Keplergasse 10, BMI / PI Keplerg. 10 - Abbruch/Neubau; Teil-GU Baumeisterarbeiten, Zimmererarbeiten
    754 m Contract awarded · contract period 29 April 2026 – 31 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 37 records · checked 15 October 2026· Found automatically. Check with the source.
    History (37)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (TED 663188-2026)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Public transport Linie O: Gußriegelstraße
    793 m Planned Source: Stadt Wien · 14 records · checked 16 October 2026
  • Zoning change Laxenburger Straße
    868 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
  • Building Favoritenstraße 2026 - U1 Abdichtungssanierung Landgutgasse bis Gudrunstraße – Baumeisterarbeiten, 1100 Wien - WLI62-fpro-14-25
    884 m Tendered · contract period 7 January 2026 – 13 November 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building LAIM | Generalunternehmerleistungen für die umfassende Sanierung des Bestandsgebäudes der VS Laimäckergasse 17, 1100 Wien
    917 m Contract awarded 9 July 2026 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Linie 15: Wienerbergtangente
    947 m Planned Source: Stadt Wien · 14 records · checked 16 October 2026
  • Building LAIM | Generalunternehmerleistungen für einen Schulneubau
    958 m Contract awarded · contract period 31 March 2026 – 7 July 2028 · end moved 467 days later since first listed Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 222510-2024)
    2. award published (TED 641758-2024)
    3. tender published (TED 790567-2025)
    4. award published (TED 473601-2026)
  • Building Wien 10., Weldeng. v. Lehmg. b. Hebbelg., Hebbelg. v. Weldeng. b. Hentzig., Hentzig. ONr. 9-15, Katharineng. vor ONr. 18 - Erd- u. Baumeisterarbeiten
    960 m Contract awarded 6 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Grenzackerstraße Kreuzung Laxenburger Straße und Raxstraße pipe laying
    984 m Under construction · works since 12 July 2026, planned until 31 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Arthaberplatz, 3 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Arthaberplatz, 3 min walk, every 2 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
1 min
Primary school
6 min
Middle school
2 min
Playground
4 min

Green and air

Green and open land within 300 m
9 %
Nearest park
Arthaberpark, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
30.4 / 10.9 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
8,870 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more children and people between 15 and 29; fewer older people

Prices

Apartments, average €/m² by building age
€ 3,024–4,354 (the Favoriten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →