Your address

Dampfschiffstraße 10

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Obere Weißgerberstraße area, with 53 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 2 % of all addresses in Vienna

The neighbourhood

Obere Weißgerberstraße area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 1787
LAir quality 29 2946
APublic transport 100 10090
GGreen space 51 4953
GNatural hazards 85 100100
EEveryday amenities 97 9797

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
79 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
8 %
Distance to the nearest park or forest (average)
99 m
Protection zone (Schutzzone)
38 %
Residents
879 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure
    208 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 03., Lorbeergasse 6- Baumeister
    327 m Contract awarded 23 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
    History (6)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
  • Public transport Vordere Zollamtsstraße von Marxergasse und Kleine Marxerbrücke bis Unbenannte Verkehrsfläche und Rad track works
    372 m Under construction · works since 1 February 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1030 Wien, Hetzgasse 2, Fassadensanierung - Baumeisterarbeiten und WDVS
    384 m Tendered 14 October 2026 Source: Kerndaten (public tenders) · checked 15 October 2026· Found automatically. Check with the source.
  • Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU
    471 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure
    505 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)
    571 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
    History (11)
    1. award published (Kerndaten)
    2. award published (TED 375124-2026)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. tender published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287
    639 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 197646-2026)
    2. award published (TED 204964-2026)
    3. award published (TED 218285-2026)
    4. award published (TED 239657-2026)
    5. award published (TED 287541-2026)
    6. award published (TED 411646-2026)
    7. award published (TED 524521-2026)
    8. award published (TED 644329-2026)
  • Building Generalunternehmerleistungen, Amtshaus 1020 Wien, Karmelitergasse 9, Generalinstandsetzung inkl. Dachgeschossausbau
    834 m Tendered · contract period 28 July 2027 – 19 July 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau
    904 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Rotundenbrücke von Kreuzung Schüttelstraße und Wittelsbachstraße bis Kreuzung Erdberger Lände und We pipe laying
    924 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Linie 29: Augarten
    934 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Franzensbrücke, 3 min walk, every 5 min
Frequent service (every 10 min or more often)
Wien Franzensbrücke, 3 min walk, every 5 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
4 min
Crèche
3 min
Kindergarten
3 min
Primary school
4 min
Middle school
14 min
Playground
5 min

Green and air

Green and open land within 300 m
8 %
Nearest park
Herrmannpark, 1 min walk
Nearest forest
unnamed, 8 min walk
NO₂ / PM2.5, modelled 2022
31.3 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
within 50 m of a flood area
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,042 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →