Your address
Dapontegasse 3
1030 Wien · 3. Landstraße
The LAGE score
This building
Fair · better than 66 % of all addresses in Vienna
The neighbourhood
Barichgasse / Juchgasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 87 | 87 |
| LAir quality | 27 | 27 | 46 |
| APublic transport | 100 | 95 | 90 |
| GGreen space | 66 | 63 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 19 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 18 %
- Distance to the nearest park or forest (average)
- 100 m
- Protection zone (Schutzzone)
- 30 %
- Residents
- 1,476 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Building Wiener Gesundheitsverbund - KLA - Klinik Landstraße Sanierung / Projektabschnitt 1 / Phase 1 - Trockenbau208 m Contract awarded · contract period 4 October 2022 – 30 August 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 149 records · checked 10 October 2026· Found automatically. Check with the source.
History (149)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Wiener Gesundheitsverbund - KLA - Klinik Landstraße Sanierung / Projektabschnitt 1 / Phase 1- Schad- und Störstoffbeseitigung208 m Contract awarded · contract period 22 August 2022 – 4 September 2027 Source: TED (EU tenders) · 124 records · checked 10 October 2026· Found automatically. Check with the source.
History (124)
- award published (TED 631887-2026)
- award published (TED 631932-2026)
- award published (TED 631948-2026)
- award published (TED 632027-2026)
- award published (TED 632377-2026)
- award published (TED 632438-2026)
- award published (TED 632545-2026)
- award published (TED 650307-2026)
-
Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)225 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 1030 Wien, Ungargasse 69, Baumeisterarbeiten 2023250 m Contract awarded 21 April 2026 Source: Kerndaten (public tenders) · 30 records · checked 10 October 2026· Found automatically. Check with the source.
History (30)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport Rennweg von 33A bis 37 track works436 m Under construction · works since 30 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Landstraßer Hauptstraße von Emmerich-Teuber-Platz und Juchgasse und Apostelgasse bis Schlachthausgas road works504 m Under construction · works since 9 March 2026, planned until 31 August 2027 Source: Stadt Wien, TED (EU tenders) · 9 records · checked 16 October 2026
History (3)
- tender published (TED 760400-2025)
- award published (TED 94160-2026)
- listed by the city
-
Pipes and cables Wien 3., Landstraßer Hauptstraße von Schlachthausgasse bis Juchgasse - Wasserrohrauswechslung - Rohrlegerarbeiten505 m Contract awarded · contract period 28 April 2026 – 13 April 2027 Source: TED (EU tenders), Kerndaten (public tenders), data.gv.at (information requests) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 140941-2026)
- tender published (TED 141271-2026)
- award published (IFG)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1030 Wien, Rennweg 14 - Gewächshaus, Zufahrt EPO - Baumeisterarbeiten510 m Contract awarded 19 May 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
New quarter Landstraßer Hauptstraße 128569 m Approved 2026 Source: Stadt Wien · checked 16 October 2026
-
New quarter Landstraßer Hauptstraße 138 - Landstraßer Schlössl673 m Approved 2026 Source: Stadt Wien · checked 16 October 2026
-
Zoning change Plandokument 8412: Gebiet zwischen Landstraßer Hauptstraße, Oberzellergasse, Klimschgasse und Eslarngasse743 m Zoning in progress 10 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Roads and bridges Große Ungarbrücke von Kreuzung Rechte Bahngasse und Am Heumarkt und Am Stadtpark bis Kreuzung Ungarg bridge works799 m Under construction · works since 16 August 2026, planned until 31 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Ungargasse/Neulinggasse, 3 min walk, every 4 min
- Frequent service (every 10 min or more often)
- Wien Ungargasse/Neulinggasse, 3 min walk, every 4 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 2 min
- Doctor's practice
- 1 min
- Crèche
- 1 min
- Kindergarten
- 1 min
- Primary school
- 3 min
- Middle school
- 3 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 19 %
- Nearest park
- Arenbergpark, 1 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 31.9 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 4,902 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; more older people
Prices
- Apartments, average €/m² by building age
- € 4,538–5,655 (the Landstraße district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →