Your address
Diehlgasse 1 - 1A
1050 Wien · 5. Margareten
The LAGE score
This building
Fair · better than 50 % of all addresses in Vienna
The neighbourhood
Margaretengürtel / Fendigasse area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 17 | 87 |
| LAir quality | 29 | 29 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 61 | 55 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 56 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 14 %
- Distance to the nearest park or forest (average)
- 35 m
- Residents
- 1,657 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026444 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport U2, 4. Ausbauphase448 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction469 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)549 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz621 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 204996-2022)
- tender published (TED 375263-2023)
- award published (TED 607779-2023)
- tender published (TED 310837-2024)
- tender published (TED 243424-2025)
-
Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction640 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Zoning change Bacherplatz642 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction642 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Matzleinsdorfer Platz unter Tragwerk ÖBB U-Bahn construction648 m Under construction · works since 14 March 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer694 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
-
Building 12., Am Fuchsenfeld 1-3, Stiegen 4, 11, 12 und 24719 m Contract awarded · contract period 6 October 2025 – 17 February 2028 · end moved 64 days later since first listed Source: TED (EU tenders) · 26 records · checked 10 October 2026· Found automatically. Check with the source.
History (26)
- award published (TED 167517-2025)
- award published (TED 169080-2025)
- award published (TED 172085-2025)
- award published (TED 241803-2025)
- award published (TED 391947-2025)
- award published (TED 536484-2025)
- tender published (TED 849893-2025)
- award published (TED 530507-2026)
-
Building KFN_ZNA_3967 Containerwaschanlage794 m Contract awarded · since 28 April 2026 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 86018-2026)
- tender published (TED 331775-2026)
- tender published (TED 365493-2026)
- tender published (TED 436776-2026)
- award published (TED 476912-2026)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB, rail 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Embelgasse, 3 min walk, every 20 min
- Frequent service (every 10 min or more often)
- Wien Eichenstraße, 3 min walk, every 2 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 2 min
- Doctor's practice
- 2 min
- Crèche
- 1 min
- Kindergarten
- 1 min
- Primary school
- 1 min
- Middle school
- 10 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 19 %
- Nearest park
- Parkanlage Mittelzone, 3 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 31.2 / 10.9 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 8,566 · very densely populated for Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 4,325–5,370 (the Margareten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →