Your address

Diehlgasse 40

1050 Wien · 5. Margareten

The outline marks the neighbourhood Diehlgasse / Arbeitergasse area, with 94 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 54 % of all addresses in Vienna

The neighbourhood

Diehlgasse / Arbeitergasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 6787
LAir quality 29 2946
APublic transport 90 10090
GGreen space 55 5753
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
23 % of addresses
Free of mapped noise ≥ 55 dB at the building
2 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
13 %
Distance to the nearest park or forest (average)
78 m
Residents
1,736 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

1 new station is planned within walking distance. 12 more projects within 1 km.

New stations nearby

Further away, within 1 km (12)
  • Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction
    435 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026
    451 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer
    493 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 636999-2024)
    2. award published (TED 210517-2025)
    3. award published (Kerndaten)
  • Zoning change Bacherplatz
    505 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction
    532 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister
    602 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse
    684 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Building KH BHS - MR - Baumeister
    748 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 523155-2026)
    2. tender published (TED 523852-2026)
    3. tender published (TED 525201-2026)
  • Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction
    752 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
    History (4)
    1. award published (TED 475971-2022)
    2. tender published (TED 829936-2025)
    3. tender published (TED 585716-2026)
    4. listed by the city
  • Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10
    752 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    783 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)
  • Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse
    804 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Einsiedlerplatz, 2 min walk, every 8 min
Frequent service (every 10 min or more often)
Wien Einsiedlerplatz, 2 min walk, every 8 min

On foot

Supermarket
2 min
Pharmacy
5 min
Doctor's practice
2 min
Crèche
3 min
Kindergarten
2 min
Primary school
2 min
Middle school
10 min
Playground
2 min

Green and air

Green and open land within 300 m
12 %
Nearest park
Einsiedlerpark, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
31.2 / 10.9 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
9,045 · very densely populated for Vienna
Who lives in the neighbourhood
more people between 15 and 29; fewer children

Prices

Apartments, average €/m² by building age
€ 4,325–5,370 (the Margareten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →