Your address

Dietrichsteingasse 5

1090 Wien · 9. Alsergrund

The outline marks the neighbourhood Wasagasse area, with 76 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 50 % of all addresses in Vienna

The neighbourhood

Wasagasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 6787
LAir quality 31 3146
APublic transport 100 10090
GGreen space 56 5353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
36 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
14 %
Distance to the nearest park or forest (average)
208 m
Protection zone (Schutzzone)
100 %
Residents
1,119 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Building 1090 Wien, Bergg. 11, Sanierung ehem. Konditorei - EG - Baumeisterarbeiten
    192 m Contract awarded 17 February 2026 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Public transport U5, 5. Ausbauphase
    269 m Planned · opening planned for 2035 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 1090 Wien, Sensengasse 2a-Universitätszahnklinik Wien - Schaden Akustikdecke- Baumeisterarbeiten
    330 m Contract awarded 26 May 2026 Source: Kerndaten (public tenders) · 16 records · checked 10 October 2026· Found automatically. Check with the source.
    History (16)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Public transport U5, 4. Ausbauphase
    507 m Planned · opening planned for 2030 Source: Stadt Wien · 21 records · checked 16 October 2026
  • Building 1090 Wien, Garnisong. 3, Sanierung, Bestandssanierung, Geschäftslokal EG, Abbruch_Arbeiten_Lokal
    533 m Contract awarded 15 May 2026 Source: Kerndaten (public tenders) · 10 records · checked 15 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Public transport U2, 4. Ausbauphase
    548 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Roads and bridges Oberleitungsumbau im Zuge des MA28 Oberflächenprojektes von Schottenring bis Alser Straße U2/22 u. U5/2
    584 m Contract awarded · contract period 6 October 2026 – 21 August 2027 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (TED 87858-2024)
    2. award published (TED 330570-2024)
    3. tender announced (TED 281261-2026)
    4. tender published (TED 457854-2026)
    5. award published (TED 673545-2026)
  • Roads and bridges Universitätsstraße Kreuzung Landesgerichtsstraße und Garnisongasse road works
    597 m Under construction · works since 3 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 25-011.843 Campus Quantum Cube – 02a Rohbau STB Hülle dicht
    604 m Contract awarded · contract period 28 May 2026 – 22 December 2027 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 248273-2026)
    2. award published (TED 563058-2026)
  • Pipes and cables Schottenring 11 pipe laying
    616 m Under construction · works since 2 August 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1090 Wien, Michelbeuerngasse 6-10, HLMW 9, Abbrucharbeiten
    665 m Contract awarded 24 September 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Pensionsversicherungsanstalt - Mietzinshaus 1010 Wien, Liebiggasse - Gebäudesanierung-Baumeisterarbeiten (Fassade, Gerüst etc)
    677 m Contract awarded 4 March 2026 Source: Kerndaten (public tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
    History (8)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Bauernfeldplatz, 3 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Bauernfeldplatz, 3 min walk, every 3 min

On foot

Supermarket
2 min
Pharmacy
2 min
Doctor's practice
1 min
Crèche
2 min
Kindergarten
1 min
Primary school
1 min
Middle school
9 min
Playground
4 min

Green and air

Green and open land within 300 m
17 %
Nearest park
Kräuterhof, 4 min walk
Nearest forest
unnamed, 6 min walk
NO₂ / PM2.5, modelled 2022
23.1 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone, UNESCO World Heritage

Residents

Residents within 300 m
4,079 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer children

Prices

Apartments, average €/m² by building age
€ 4,750–6,404 (the Alsergrund district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →