Your address

Donaueschingenstraße 8

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Universumstraße area, with 87 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 15 % of all addresses in Vienna

The neighbourhood

Universumstraße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 20 3287
LAir quality 29 3646
APublic transport 100 10090
GGreen space 45 4053
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
60 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
8 %
Distance to the nearest park or forest (average)
279 m
Protection zone (Schutzzone)
34 %
Residents
3,571 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying
    103 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Linie 12: Stufe 2 Nordwestbahnhof
    155 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Städtebauvorhaben Nordwestbahnhof
    382 m Approved 2022 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026
  • New quarter 20., Nordwestbahnhof
    412 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
  • New quarter Engerthstraße
    467 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables Baumeisterarbeiten - Kanalsanierung inkl. Hybridanlagen, Schule 1200 Wien, Vorgartenstraße 95-97
    505 m Contract awarded 7 October 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Building Generalunternehmervertrag: 20., Wallensteinstraße 68-72
    538 m Tendered · contract period 1 March 2027 – 31 August 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • New quarter Nordwestbahnstraße 59-39
    543 m Approved 2022 Source: Stadt Wien · checked 16 October 2026
  • Zoning change Nordbahnhof-Innstraße
    567 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    572 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34
    654 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • New quarter 20., Nordwestbahnhof – Phase A.1
    760 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB, rail 70–74 dB
Quiet side
no

Getting around

Public transport class
A
Nearest stop
Wien Traisengasse, 2 min walk, every 1 min
Frequent service (every 10 min or more often)
Wien Traisengasse, 2 min walk, every 1 min

On foot

Supermarket
2 min
Pharmacy
6 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
1 min
Primary school
8 min
Middle school
7 min
Playground
5 min

Green and air

Green and open land within 300 m
9 %
Nearest park
Mortarapark, 3 min walk
Nearest forest
unnamed, 12 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
4,992 · more densely populated than most of Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →