Your address
Dresdner Straße 77
1200 Wien · 20. Brigittenau
The LAGE score
This building
Modest · better than 26 % of all addresses in Vienna
The neighbourhood
Universumstraße area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 39 | 32 | 87 |
| LAir quality | 29 | 36 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 44 | 40 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 60 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 8 %
- Distance to the nearest park or forest (average)
- 279 m
- Protection zone (Schutzzone)
- 34 %
- Residents
- 3,571 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying114 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Linie 12: Stufe 2 Nordwestbahnhof139 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
-
New quarter Städtebauvorhaben Nordwestbahnhof359 m Approved 2022 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026
-
New quarter 20., Nordwestbahnhof390 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
-
New quarter Engerthstraße487 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables Baumeisterarbeiten - Kanalsanierung inkl. Hybridanlagen, Schule 1200 Wien, Vorgartenstraße 95-97514 m Contract awarded 7 October 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Building Generalunternehmervertrag: 20., Wallensteinstraße 68-72517 m Tendered · contract period 1 March 2027 – 31 August 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Nordwestbahnstraße 59-39520 m Approved 2022 Source: Stadt Wien · checked 16 October 2026
-
Zoning change Nordbahnhof-Innstraße559 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Nach öffentlicher Auflage
-
Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St561 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34670 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter 20., Nordwestbahnhof – Phase A.1744 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 65–69 dB, rail 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Traisengasse, 2 min walk, every 1 min
- Frequent service (every 10 min or more often)
- Wien Traisengasse, 2 min walk, every 1 min
On foot
- Supermarket
- 2 min
- Pharmacy
- 6 min
- Doctor's practice
- 3 min
- Crèche
- 3 min
- Kindergarten
- 1 min
- Primary school
- 8 min
- Middle school
- 7 min
- Playground
- 5 min
Green and air
- Green and open land within 300 m
- 8 %
- Nearest park
- Mortarapark, 3 min walk
- Nearest forest
- unnamed, 12 min walk
- NO₂ / PM2.5, modelled 2022
- 31.2 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 4,992 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 3,569–5,058 (the Brigittenau district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →