Your address
Eichenstraße 1
1120 Wien · 12. Meidling
The LAGE score
This building
Weak · better than 6 % of all addresses in Vienna
The neighbourhood
Karl-Löwe-Gasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 5 | 47 | 87 |
| LAir quality | 29 | 29 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 59 | 55 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 43 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 5 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 12 %
- Distance to the nearest park or forest (average)
- 98 m
- Protection zone (Schutzzone)
- 3 %
- Residents
- 2,597 · very densely populated for Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)341 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Building 12., Am Fuchsenfeld 1-3, Stiegen 4, 11, 12 und 24504 m Contract awarded · contract period 6 October 2025 – 17 February 2028 · end moved 64 days later since first listed Source: TED (EU tenders) · 26 records · checked 10 October 2026· Found automatically. Check with the source.
History (26)
- award published (TED 167517-2025)
- award published (TED 169080-2025)
- award published (TED 172085-2025)
- award published (TED 241803-2025)
- award published (TED 391947-2025)
- award published (TED 536484-2025)
- tender published (TED 849893-2025)
- award published (TED 530507-2026)
-
Building KFN_ZNA_3967 Containerwaschanlage544 m Contract awarded · since 28 April 2026 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 86018-2026)
- tender published (TED 331775-2026)
- tender published (TED 365493-2026)
- tender published (TED 436776-2026)
- award published (TED 476912-2026)
-
Building Rahmenvereinbarung zum Um- bzw. Zubau der Gebäude ARIO und Produktionsküche am Areal der Klinik Favoriten in drei Losen (Teil-GUs Bautechnik, ET, und HKLSR)571 m Contract awarded 16 April 2026 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Wiener Gesundheitsverbund - Leistungen Möbeltischler für die Errichtung eines Provisoriums als Zu-/Neubau in Modul-/Fertigteilbauweise, sowie Sanierungen im Bestand der Klinik Favoriten571 m Contract awarded · since 1 July 2022 Source: TED (EU tenders) · 55 records · checked 15 October 2026· Found automatically. Check with the source.
History (55)
- tender published (TED 763245-2025)
- tender published (TED 835268-2025)
- award published (TED 350930-2026)
- award published (TED 439138-2026)
- award published (TED 615637-2026)
- award published (TED 615894-2026)
- award published (TED 694156-2026)
- award published (TED 694709-2026)
-
Public transport Flurschützstraße von Kreuzung Aßmayergasse und Wilhelmstraße bis Kreuzung Längenfeldgasse track works656 m Under construction · works since 5 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport U2, 4. Ausbauphase688 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026714 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz719 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 204996-2022)
- tender published (TED 375263-2023)
- award published (TED 607779-2023)
- tender published (TED 310837-2024)
- tender published (TED 243424-2025)
-
Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction743 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Matzleinsdorfer Platz unter Tragwerk ÖBB U-Bahn construction746 m Under construction · works since 14 March 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction769 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 70–74 dB
- Quiet side
- no
Getting around
- Public transport class
- A
- Nearest stop
- Wien Eichenstraße, 2 min walk, every 2 min
- Frequent service (every 10 min or more often)
- Wien Eichenstraße, 2 min walk, every 2 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 3 min
- Doctor's practice
- 3 min
- Crèche
- 3 min
- Kindergarten
- 2 min
- Primary school
- 6 min
- Middle school
- 9 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 14 %
- Nearest park
- Parkanlage Mittelzone, 1 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 31.2 / 10.9 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 4,327 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more children and people between 15 and 29; fewer older people
Prices
- Apartments, average €/m² by building age
- € 3,573–5,225 (the Meidling district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →