Your address
Eidechsengasse 47
1220 Wien · 22. Donaustadt
The LAGE score
This building
Fair · better than 62 % of all addresses in Vienna
The neighbourhood
Pfalzgasse area · Good · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 95 | 87 | 87 |
| LAir quality | 57 | 57 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 95 | 85 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 32 | 46 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 9 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 47 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 52 %
- Green & open land within 300 m (average)
- 41 %
- Distance to the nearest park or forest (average)
- 242 m
- Residents
- 4,186 · less densely populated than most of Vienna
Building works and projects nearby
2 projects reach this address. 12 more projects within 1 km.
Works and changes that reach this address
-
Building Generalunternehmerleistungen, Einsatzkräftestützpunkt-Aspern, 1220 Wien, Mayredergasse21 m Tendered · contract period 2 March 2027 – 4 May 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
New quarter Pfalzgasse89 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
Further away, within 1 km (12)
-
New quarter Podhagskygasse403 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges S 1 (Neubau)469 m Planned Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges S 1 (Neubau)469 m Planned Source: Stadt Wien · checked 13 October 2026
-
Roads and bridges S 1 Wiener Außenring Schnellstraße, ABS Knoten Raasdorf, Am Heidjöchl (Spange Seestadt Aspern)480 m Approved 2018 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Roads and bridges Stadtstraße Aspern487 m Approved 2018 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Public transport Linie 25: Verlängerung in die Seestadt624 m Planned Source: Stadt Wien · 49 records · checked 16 October 2026
-
New quarter 22., Am Heidjöchl702 m Planned · 5200 flats Source: Stadt Wien · checked 16 October 2026
-
Building 22., Podhagskygasse - 1. Wiener WohnBAUMprogramm - Phase II760 m Planned · completion expected 2028 · 192 flats Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges Stadtstraße (Neubau)778 m Planned Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges Stadtstraße (Neubau)778 m Planned Source: Stadt Wien · checked 13 October 2026
-
Building Errichtung eines Bildungscampus, 22., Bildungscampus Seestadt Aspern III, Sonnenallee 73896 m Contract awarded 20 September 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- tender announced (TED 650075-2026)
-
Zoning change Hausfeldstraße936 m Zoning in progress · building freeze since 16 July 2025 Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- below 55 dB
- Quiet side
- –
Getting around
- Public transport class
- B
- Nearest stop
- Wien Mayredergasse, 2 min walk, every 13 min
- Frequent service (every 10 min or more often)
- Wien Aspern Nord, Mayrederbrücke, 8 min walk, every 8 min
On foot
- Supermarket
- 20 min
- Pharmacy
- 20 min
- Doctor's practice
- more than 1.0 km away
- Crèche
- 17 min
- Kindergarten
- 1 min
- Primary school
- 17 min
- Middle school
- 17 min
- Playground
- 13 min
Green and air
- Green and open land within 300 m
- 45 %
- Nearest park
- Naturschutzgebiet Breitenlee, 14 min walk
- Nearest forest
- unnamed, 2 min walk
- NO₂ / PM2.5, modelled 2022
- 15.6 / 13.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 717 · less densely populated than most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; more children; fewer older people
Prices
- Apartments, average €/m² by building age
- € 3,653–5,214 (the Donaustadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →