Your address
Engerthstraße 108
1200 Wien · 20. Brigittenau
The LAGE score
This building
Fair · better than 66 % of all addresses in Vienna
The neighbourhood
Vorgartenstraße / Allerheiligenplatz area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 39 | 87 |
| LAir quality | 36 | 36 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 71 | 68 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 52 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 21 %
- Distance to the nearest park or forest (average)
- 87 m
- Residents
- 2,120 · very densely populated for Vienna
Building works and projects nearby
1 project reaches this address. 11 more projects within 1 km.
Works and changes that reach this address
-
New quarter Engerthstraßeon this street Approved 2018 Source: Stadt Wien · checked 16 October 2026
Further away, within 1 km (11)
-
Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying226 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Baumeisterarbeiten - Kanalsanierung inkl. Hybridanlagen, Schule 1200 Wien, Vorgartenstraße 95-97349 m Contract awarded 7 October 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Public transport Linie 12: Stufe 2 Nordwestbahnhof544 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
-
Zoning change Nordbahnhof-Innstraße592 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Nach öffentlicher Auflage
-
Pipes and cables Kanal-Instandsetzung inkl. Einbau von vier Hybridpumpenanlagen und Baumeister Erdbauarbeiten, Amtshaus 20., Stromstraße 34669 m Contract awarded 20 July 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St773 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
New quarter Städtebauvorhaben Nordwestbahnhof815 m Approved 2022 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026
-
New quarter 20., Nordwestbahnhof829 m Tendered · 5700 flats Source: Stadt Wien · checked 16 October 2026
-
Building 20., Friedrich-Engels-Platz 17, Wehlistraße 32-38877 m Tendered · contract period 15 March 2027 – 15 December 2028 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building 1210 Wien, Donauinselplatz 1 (Schulschiff) - Errichtung einer Photovoltaikanlage982 m Contract awarded 12 May 2026 Source: Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
New quarter Nordwestbahnstraße 59-391,000 m Approved 2022 Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Allerheiligenplatz, 2 min walk, every 20 min
- Frequent service (every 10 min or more often)
- Wien Allerheiligengasse, 3 min walk, every 3 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 4 min
- Doctor's practice
- 5 min
- Crèche
- 1 min
- Kindergarten
- 1 min
- Primary school
- 5 min
- Middle school
- 7 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 23 %
- Nearest park
- Allerheiligenpark, 1 min walk
- Nearest forest
- unnamed, 11 min walk
- NO₂ / PM2.5, modelled 2022
- 29.1 / 11.4 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 8,504 · very densely populated for Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna
Prices
- Apartments, average €/m² by building age
- € 3,569–5,058 (the Brigittenau district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →