Your address

Erndtgasse 25

1180 Wien · 18. Währing

The outline marks the neighbourhood Hockegasse / Bastiengasse area, with 8 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 44 % of all addresses in Vienna

The neighbourhood

Hockegasse / Bastiengasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 95 8787
LAir quality 40 4046
APublic transport 78 7890
GGreen space 35 3453
GNatural hazards 100 100100
EEveryday amenities 96 9597

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
0 % of addresses
Free of mapped noise ≥ 55 dB at the building
38 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
38 %
Green & open land within 300 m (average)
4 %
Distance to the nearest park or forest (average)
314 m
Protection zone (Schutzzone)
88 %
Residents
69 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 4 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (4)
  • Zoning change Gersthofer Straße
    206 m Zoning in progress · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Vor Genehmigt
  • Building 1180 Wien, Bastiengasse 26, Funktionsadaptierung und Sanierung des historischen Bestandes Semmelweisareal Haus 1, Gefährlicher Abbruch
    233 m Contract awarded 24 June 2026 Source: Kerndaten (public tenders) · 31 records · checked 10 October 2026· Found automatically. Check with the source.
    History (31)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Stadt Wien - Wiener Wohnen - 18., Hockegasse 9 - Baumeister
    410 m Contract awarded 10 February 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Pipes and cables Wien 16., /17., Sandleiteng. # Nietzschepl. über Güpferlingstr. b. Alszeile # Grünbeckweg + 17., Alszeile v. # Güpferlingstr. b. # Alsg. – Wasserrohrausw.
    813 m Tendered · contract period 11 January 2027 – 30 November 2027 Source: TED (EU tenders) · 2 records · checked 16 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 716974-2026)
    2. tender published (TED 717965-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
below 55 dB
Quiet side
–

Getting around

Public transport class
C
Nearest stop
Wien Erndtgasse, 4 min walk, every 9 min
Frequent service (every 10 min or more often)
Wien Erndtgasse, 4 min walk, every 9 min

On foot

Supermarket
3 min
Pharmacy
7 min
Doctor's practice
4 min
Crèche
2 min
Kindergarten
2 min
Primary school
4 min
Middle school
20 min
Playground
3 min

Green and air

Green and open land within 300 m
5 %
Nearest park
Turnplatz Turnverein Gersthof, 5 min walk
Nearest forest
unnamed, 15 min walk
NO₂ / PM2.5, modelled 2022
27.9 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
3,613 · about as densely populated as most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 4,470–5,735 (the Währing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →