Your address
Fasangartengasse 38
1130 Wien · 13. Hietzing
The LAGE score
This building
Weak · better than 11 % of all addresses in Vienna
The neighbourhood
Konrad-Duden-Gasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 17 | 87 | 87 |
| LAir quality | 43 | 59 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 25 | 40 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 97 | 99 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 12 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 6 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 58 %
- Green & open land within 300 m (average)
- 10 %
- Distance to the nearest park or forest (average)
- 380 m
- Residents
- 832 · about as densely populated as most of Vienna
Building works and projects nearby
1 project reaches this address. 11 more projects within 1 km.
Works and changes that reach this address
-
Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)94 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
Further away, within 1 km (11)
-
Zoning change Plandokument 8381: Gebiet zwischen Hummelgasse, Veitingergasse, Lainzer Straße, Jagdschloßgasse, Steinlechnergasse, Versorgungsheimstraße, Linienzug 1-3, Preyer183 m Zoning in progress 1 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Building 13., Biraghigasse 38-42547 m Tendered · contract period 15 March 2027 – 15 September 2029 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 368351-2026)
- tender published (TED 446561-2026)
- tender published (TED 506702-2026)
-
Building 13., Speisinger Straße 47-53568 m Tendered · contract period 15 March 2027 – 15 March 2029 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 438945-2026)
- tender published (TED 440258-2026)
- tender published (TED 440371-2026)
- tender published (TED 440593-2026)
-
Building Stadt Wien - Wiener Wohnen - 13., Elisabethallee 79 - BAUMEISTER574 m Contract awarded · contract period 15 April 2024 – 15 January 2029 · end moved 984 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 51 records · checked 16 October 2026· Found automatically. Check with the source.
History (51)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (TED 439912-2025)
- tender published (TED 634444-2026)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (TED 714566-2026)
-
Building 13., Waldvogelstraße 18-24624 m Tendered · contract period 15 December 2026 – 15 April 2029 Source: TED (EU tenders) · 14 records · checked 10 October 2026· Found automatically. Check with the source.
History (14)
- tender published (TED 251842-2026)
- tender published (TED 253994-2026)
- tender published (TED 306774-2026)
- tender published (TED 319482-2026)
- tender published (TED 374367-2026)
- tender published (TED 428823-2026)
- tender published (TED 489121-2026)
- tender published (TED 519772-2026)
-
Pipes and cables Montecuccoliplatz ggü. 12 bis Ende des Gustav-Zelibor-Park pipe laying686 m Under construction · works since 1 February 2026, planned until 31 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges 13., Maxingstraße718 m Contract awarded · contract period 18 August 2026 – 11 December 2026 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 382013-2026)
- tender published (TED 446202-2026)
- award published (TED 597931-2026)
-
Public transport Gleissanierungsoffensive Lainzer Straße 2-94, 1130 Wien, Gleisbau (Wiener Linien) und Straßenbau (MA 28)848 m Tendered · contract period 22 February 2027 – 22 December 2027 Source: TED (EU tenders) · checked 16 October 2026· Found automatically. Check with the source.
-
Pipes and cables Maxingstraße von Kreuzung Hanselmayergasse bis Kreuzung Trauttmansdorffgasse pipe laying861 m Under construction · works since 6 April 2026, planned until 31 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Lainzer Straße von Hietzinger Hauptstraße und Altgasse bis Stadlergasse pipe laying924 m Under construction · works since 24 August 2026, planned until 26 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Wien 13., Lainzer Straße von Altgasse bis Stadlergasse - Wasserrohrauswechslungen - Generalunternehmer925 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Preyergasse, 4 min walk, every 4 min
- Frequent service (every 10 min or more often)
- Wien Preyergasse, 4 min walk, every 4 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 8 min
- Doctor's practice
- 6 min
- Crèche
- 5 min
- Kindergarten
- 5 min
- Primary school
- 8 min
- Middle school
- 13 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 6 %
- Nearest park
- Furtwänglerpark, 9 min walk
- Nearest forest
- unnamed, 11 min walk
- NO₂ / PM2.5, modelled 2022
- 27.2 / 12.1 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 1,811 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; more older people; fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 4,100–5,905 (the Hietzing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →