Your address

Felbigergasse 105

1140 Wien · 14. Penzing

The outline marks the neighbourhood Felbigergasse / Hütteldorfer Straße area, with 141 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Good · better than 70 % of all addresses in Vienna

The neighbourhood

Felbigergasse / Hütteldorfer Straße area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 1787
LAir quality 42 4246
APublic transport 100 10090
GGreen space 46 5353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
60 % of addresses
Free of mapped noise ≥ 55 dB at the building
9 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
11 %
Distance to the nearest park or forest (average)
152 m
Protection zone (Schutzzone)
3 %
Residents
2,979 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 projects reach this address. 7 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (7)
  • Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)
    321 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Zoning change Hackinger Straße
    498 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
  • Pipes and cables V15 Wientalquerung Düker 1. HL, 13., Preindlgasse 35
    624 m Tendered · contract period 20 July 2026 – 20 December 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works
    677 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges (ProVia-ID 131281) Attraktivierung der Verbindungsbahn; Baumeisterarbeiten Baulos Mitte
    726 m Contract awarded · contract period 8 September 2025 – 10 May 2030 Source: TED (EU tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
    History (8)
    1. tender published (TED 128478-2025)
    2. tender published (TED 227365-2025)
    3. award published (TED 542988-2025)
    4. tender published (TED 56300-2026)
    5. tender published (TED 77108-2026)
    6. tender published (TED 183076-2026)
    7. tender published (TED 211874-2026)
    8. award published (TED 592567-2026)
  • Zoning change Plandokument 8436: Gebiet zwischen Hietzinger Kai, Fleschgasse, Auhofstraße und St.-Veit-Gasse
    869 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Building Teil-GU Baumeisterarbeiten: Lüftungsanlage und NSHV Pav.3 Mein Hanusch-Krankenhaus, Heinrich-Collin-Straße 30,1140 Wien
    889 m Contract awarded 7 November 2024 Source: Kerndaten (public tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Gruschaplatz, 2 min walk, every 5 min
Frequent service (every 10 min or more often)
Wien Gruschaplatz, 2 min walk, every 5 min

On foot

Supermarket
3 min
Pharmacy
2 min
Doctor's practice
3 min
Crèche
1 min
Kindergarten
1 min
Primary school
1 min
Middle school
9 min
Playground
4 min

Green and air

Green and open land within 300 m
10 %
Nearest park
Gustav-Klimt-Park, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
27.4 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,840 · more densely populated than most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people; fewer children and people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 3,694–5,796 (the Penzing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →