Your address
Fillgradergasse 3
1060 Wien · 6. Mariahilf
The LAGE score
This building
Modest · better than 31 % of all addresses in Vienna
The neighbourhood
Gumpendorfer Straße area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 67 | 87 |
| LAir quality | 24 | 24 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 41 | 40 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 48 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 4 %
- Distance to the nearest park or forest (average)
- 156 m
- Protection zone (Schutzzone)
- 83 %
- Residents
- 1,185 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Roads and bridges 6., Windmühlgasse u.a.118 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 451515-2026)
- tender published (TED 518208-2026)
- award published (TED 672839-2026)
-
Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten263 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works278 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Naschmarkt – Ost – Marktraum vorbereitende Maßnahmen Bauphase 1A306 m Tendered · contract period 23 October 2024 – 21 February 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 512553-2024)
- tender published (TED 661131-2024)
- tender published (TED 718666-2024)
- tender published (TED 513099-2026)
-
Building 1060 Wien, Getreidemarkt 9- Baumeisterarbeiten (Zaunsanierung)319 m Contract awarded 2 September 2026 Source: Kerndaten (public tenders) · 13 records · checked 10 October 2026· Found automatically. Check with the source.
History (13)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 04., Rechte Wienzeile 25-27332 m Contract awarded · contract period 15 March 2025 – 2 April 2028 · end moved 47 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 149259-2025)
- award published (TED 187214-2025)
- tender published (TED 239094-2025)
- award published (TED 269220-2025)
- award published (TED 321786-2025)
- tender published (TED 471650-2025)
- award published (TED 535946-2025)
- award published (TED 34015-2026)
-
Public transport U2, 4. Ausbauphase493 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Public transport Kirchengasse 1 bis 30 U-Bahn construction504 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Durchführung von Baumeisterarbeiten im Objekt DC, Wiedner Hauptstraße 8-10, 1040 Wien608 m Contract awarded 30 June 2026 Source: Kerndaten (public tenders) · 11 records · checked 10 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Roads and bridges Burggasse 25 bis 45 road works650 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 04., Preßgasse 7 - Baumeister658 m Contract awarded 27 November 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten669 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
History (12)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Laimgrubengasse, 1 min walk, every 8 min
- Frequent service (every 10 min or more often)
- Wien Laimgrubengasse, 1 min walk, every 8 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 2 min
- Doctor's practice
- 2 min
- Crèche
- 4 min
- Kindergarten
- 4 min
- Primary school
- 10 min
- Middle school
- 10 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 3 %
- Nearest park
- Alfred-Grünwald-Park, 2 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 32.7 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone, UNESCO World Heritage
Residents
- Residents within 300 m
- 4,685 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; fewer children
Prices
- Apartments, average €/m² by building age
- € 4,708–5,445 (the Mariahilf district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →