Your address

Goldschlagstraße 106

1150 Wien · 15. Rudolfsheim-Fünfhaus

The outline marks the neighbourhood Sturzgasse area, with 73 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 13 % of all addresses in Vienna

The neighbourhood

Sturzgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 8787
LAir quality 32 5046
APublic transport 100 10090
GGreen space 36 3553
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
18 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
2 %
Distance to the nearest park or forest (average)
187 m
Residents
1,862 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Zoning change Johnstraße
    85 m Approved · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Genehmigt
  • Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch
    440 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Meiselstraße
    443 m Zoning in progress · draft on public display 5 August 2026 – 16 September 2026; building freeze until 5 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage
  • Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works
    642 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
    History (10)
    1. award published (Kerndaten)
    2. tender published (TED 862003-2025)
    3. tender published (TED 247267-2026)
    4. award published (TED 256589-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 552509-2026)
    8. listed by the city
  • Public transport Märzstraße 49 bis Kreuzung Huglgasse sowie Kreuzung Huglgasse bis Kreuzung Hütteldorfer Straße track works
    702 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Oeverseestraße
    757 m Approved · draft on public display 27 May 2026 – 24 June 2026; building freeze until 27 December 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Genehmigt
  • New quarter Spallartgasse
    790 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
  • Building 15., Loeschenkohlgasse 30-32
    821 m Contract awarded · contract period 14 August 2025 – 1 October 2027 Source: TED (EU tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. tender published (TED 688999-2024)
    2. award published (TED 96993-2025)
    3. award published (TED 118600-2025)
    4. award published (TED 137192-2025)
    5. award published (TED 172916-2025)
    6. award published (TED 368070-2025)
    7. award published (TED 402718-2025)
    8. award published (TED 431101-2025)
  • Building REIC | Generalunternehmerleistungen für die Generalsanierung der Ganztagsvolksschule in 1150 Wien, Reichsapfelgasse 30
    854 m Contract awarded · contract period 6 May 2025 – 21 January 2028 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 689725-2024)
    2. award published (Kerndaten)
    3. award published (TED 303483-2025)
  • New quarter Kendlerstraße
    901 m Approved 2020 Source: Stadt Wien · checked 16 October 2026
  • New quarter Kendlerstraße - Nachtrag
    901 m Approved 2025 Source: Stadt Wien · checked 16 October 2026
  • Building 1150 Wien, Auf der Schmelz 4, LED-Beleuchtung und abgehängte Decken, Abbrucharbeiten Bauphase 2026
    916 m Contract awarded 2 June 2026 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Johnstraße/Märzstraße, 3 min walk, every 10 min
Frequent service (every 10 min or more often)
Wien Johnstraße/Märzstraße, 3 min walk, every 10 min

On foot

Supermarket
4 min
Pharmacy
1 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
2 min
Primary school
5 min
Middle school
7 min
Playground
2 min

Green and air

Green and open land within 300 m
3 %
Nearest park
Forschneritschpark, 3 min walk
Nearest forest
unnamed, 12 min walk
NO₂ / PM2.5, modelled 2022
30.5 / 10.9 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
7,756 · very densely populated for Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 3,591–4,905 (the Rudolfsheim-Fünfhaus district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →