Your address

Graumanngasse 33

1150 Wien · 15. Rudolfsheim-Fünfhaus

The outline marks the neighbourhood Storchengasse area, with 64 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 27 % of all addresses in Vienna

The neighbourhood

Storchengasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 39 6787
LAir quality 31 3146
APublic transport 100 10090
GGreen space 44 4053
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
38 % of addresses
Free of mapped noise ≥ 55 dB at the building
2 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
4 %
Distance to the nearest park or forest (average)
163 m
Protection zone (Schutzzone)
45 %
Residents
926 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 11 more projects within 1 km.

Further away, within 1 km (11)
  • Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse
    338 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Pipes and cables Schönbrunner Straße von 247 bis 257 sewer works
    385 m Under construction · works since 5 July 2026, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Totalunternehmerleistungen für die Sanierung der städtischen Wohnhausanlage Migazziplatz 8-9, 1120 Wien
    561 m Contract awarded 14 February 2025 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 450507-2024)
    2. award published (Kerndaten)
    3. award published (TED 105071-2025)
  • Building GU Baumeisterarbeiten, Berufsschule 1120 Wien, Längenfeldgasse 13-15
    562 m Contract awarded · contract period 26 May 2025 – 1 October 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 18 records · checked 10 October 2026· Found automatically. Check with the source.
    History (18)
    1. award published (TED 480164-2025)
    2. award published (Kerndaten)
    3. tender published (TED 58925-2026)
    4. tender published (TED 103387-2026)
    5. award published (TED 317420-2026)
    6. award published (Kerndaten)
    7. award published (TED 329842-2026)
    8. award published (Kerndaten)
  • Building Generalunternehmerleistungen, AH 12., Theresienbadgasse 3
    567 m Contract awarded · contract period 20 January 2026 – 25 May 2028 · end moved 170 days later since first listed Source: TED (EU tenders), data.gv.at (information requests), Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 490323-2025)
    2. award published (TED 439326-2026)
    3. award published (Kerndaten)
    4. award published (IFG)
    5. award published (IFG)
  • Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works
    571 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
    History (10)
    1. award published (Kerndaten)
    2. tender published (TED 862003-2025)
    3. tender published (TED 247267-2026)
    4. award published (TED 256589-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 552509-2026)
    8. listed by the city
  • Building REIC | Generalunternehmerleistungen für die Generalsanierung der Ganztagsvolksschule in 1150 Wien, Reichsapfelgasse 30
    671 m Contract awarded · contract period 6 May 2025 – 21 January 2028 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 689725-2024)
    2. award published (Kerndaten)
    3. award published (TED 303483-2025)
  • Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister
    719 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch
    807 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus
    844 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Flurschützstraße von Kreuzung Aßmayergasse und Wilhelmstraße bis Kreuzung Längenfeldgasse track works
    940 m Under construction · works since 5 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Stiegergasse, 2 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Stiegergasse, 2 min walk, every 4 min

On foot

Supermarket
3 min
Pharmacy
3 min
Doctor's practice
1 min
Crèche
1 min
Kindergarten
1 min
Primary school
3 min
Middle school
7 min
Playground
1 min

Green and air

Green and open land within 300 m
6 %
Nearest park
Sechshauser Park, 2 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
30.8 / 11.3 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
6,204 · more densely populated than most of Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 3,591–4,905 (the Rudolfsheim-Fünfhaus district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →