Your address

Grillgasse 11

1110 Wien · 11. Simmering

The outline marks the neighbourhood Braunhubergasse / Dommesgasse area, with 55 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 26 % of all addresses in Vienna

The neighbourhood

Braunhubergasse / Dommesgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 39 6787
LAir quality 34 3446
APublic transport 100 10090
GGreen space 38 4653
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
36 % of addresses
Free of mapped noise ≥ 55 dB at the building
7 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
8 %
Distance to the nearest park or forest (average)
177 m
Protection zone (Schutzzone)
6 %
Residents
2,269 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 8 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (8)
  • Building ENK2 | Totalunternehmer für die SANIERUNG UND PLANUNG NMS I+II Enkplatz, 1110 Wien
    280 m Contract awarded 25 January 2026 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Zoning change Plandokument 8460: Gebiet zwischen Leberstraße, Grillgasse, Linienzug 1-2 (Werkstättenweg), Hauffgasse, Linienzug 3-7 und Geiselbergstraße
    490 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • New quarter Leberstraße 96
    555 m Approved Source: Stadt Wien · checked 16 October 2026
  • Public transport (ProVia-ID 118235) 9203 - DANI 3; Neubau mechanische Fertigung, Baumeisterarbeiten
    677 m Contract awarded · contract period 1 December 2023 – 30 March 2029 Source: TED (EU tenders) · 29 records · checked 10 October 2026· Found automatically. Check with the source.
    History (29)
    1. award published (TED 751387-2025)
    2. tender published (TED 262132-2026)
    3. award published (TED 370885-2026)
    4. award published (TED 561804-2026)
    5. award published (TED 592026-2026)
    6. award published (TED 611397-2026)
    7. tender published (TED 640203-2026)
    8. award published (TED 666991-2026)
  • Roads and bridges Simmeringer Hauptstraße von Litfaßstraße bis Zippererstraße road works
    749 m Under construction · works since 18 May 2026, planned until 28 May 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • New quarter Hallergasse
    785 m Approved 2019 Source: Stadt Wien · checked 16 October 2026
  • New quarter Gasometervorfeld EBG Hallergasse
    785 m Approved 2024 Source: Stadt Wien · checked 16 October 2026
  • New quarter Gasometervorfeld EBG Eyzinggasse
    871 m Approved 2024 Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 65–69 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Enkplatz, 2 min walk, every 1 min
Frequent service (every 10 min or more often)
Wien Enkplatz, 2 min walk, every 1 min

On foot

Supermarket
1 min
Pharmacy
5 min
Doctor's practice
3 min
Crèche
3 min
Kindergarten
3 min
Primary school
5 min
Middle school
5 min
Playground
5 min

Green and air

Green and open land within 300 m
5 %
Nearest park
Braunhuberpark, 4 min walk
Nearest forest
unnamed, 14 min walk
NO₂ / PM2.5, modelled 2022
29.7 / 11.4 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
outside all zones

Residents

Residents within 300 m
6,908 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer older people

Prices

Apartments, average €/m² by building age
€ 3,048–3,606 (the Simmering district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →