Your address

Große Stadtgutgasse 13

1020 Wien · 2. Leopoldstadt

The outline marks the neighbourhood Große Stadtgutgasse area, with 135 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 47 % of all addresses in Vienna

The neighbourhood

Große Stadtgutgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 6787
LAir quality 37 3746
APublic transport 100 10090
GGreen space 44 4153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
29 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
193 m
Residents
3,123 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Public transport Linie 29: Augarten
    222 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Abbrucharbeiten, Schule 1020 Wien, Schwarzingergasse 4
    435 m Contract awarded · contract period 13 July 2026 – 14 December 2026 Source: TED (EU tenders), data.gv.at (information requests), Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 257419-2026)
    2. award published (TED 484683-2026)
    3. award published (Kerndaten)
    4. award published (IFG)
  • Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29
    445 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau
    479 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building Generalunternehmerleistungen, Amtshaus 1020 Wien, Karmelitergasse 9, Generalinstandsetzung inkl. Dachgeschossausbau
    483 m Tendered · contract period 28 July 2027 – 19 July 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)
    506 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
    History (11)
    1. award published (Kerndaten)
    2. award published (TED 375124-2026)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. tender published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Building Stadt Wien - Wiener Wohnen - 02., Miesbachgasse 15 - Dach
    530 m Contract awarded · since 4 February 2025 Source: TED (EU tenders), Kerndaten (public tenders) · 33 records · checked 10 October 2026· Found automatically. Check with the source.
    History (33)
    1. award published (TED 154504-2025)
    2. award published (TED 161893-2025)
    3. award published (Kerndaten)
    4. award published (TED 444666-2025)
    5. award published (Kerndaten)
    6. tender published (TED 676291-2025)
    7. award published (Kerndaten)
    8. award published (TED 234839-2026)
  • Building Heizung, Klimatechnik, Lüftung und Sanitär
    557 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 629712-2025)
    2. tender published (TED 701861-2025)
    3. tender published (TED 705095-2025)
  • Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure
    583 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying
    599 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 20., Nordwestbahnhof – Phase A.2
    730 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten
    769 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 281451-2024)
    2. award published (TED 492315-2024)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Taborstraße, 3 min walk, every 2 min
Frequent service (every 10 min or more often)
Wien Taborstraße, 3 min walk, every 2 min

On foot

Supermarket
1 min
Pharmacy
3 min
Doctor's practice
1 min
Crèche
3 min
Kindergarten
1 min
Primary school
1 min
Middle school
1 min
Playground
4 min

Green and air

Green and open land within 300 m
8 %
Nearest park
Augarten, 3 min walk
Nearest forest
unnamed, 9 min walk
NO₂ / PM2.5, modelled 2022
28.9 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
8,643 · very densely populated for Vienna
Who lives in the neighbourhood
a typical age mix for Vienna

Prices

Apartments, average €/m² by building age
€ 4,603–6,369 (the Leopoldstadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →