Your address
Gutheil-Schoder-Gasse 9A
1100 Wien · 10. Favoriten
The LAGE score
This building
Weak · better than 10 % of all addresses in Vienna
The neighbourhood
Gutheil-Schoder-Gasse / Triester Straße area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 5 | 27 | 87 |
| LAir quality | 36 | 36 | 46 |
| APublic transport | 100 | 90 | 90 |
| GGreen space | 87 | 95 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 91 | 91 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 69 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 3 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 90 %
- Green & open land within 300 m (average)
- 38 %
- Distance to the nearest park or forest (average)
- 53 m
- Residents
- 1 · very thinly populated for Vienna
Building works and projects nearby
1 project reaches this address. 8 more projects within 1 km.
Works and changes that reach this address
-
Zoning change Computerstraßehere Approved · draft on public display 22 April 2026 – 4 June 2026; building freeze until 22 November 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
History (2)
- building freeze announced
- procedure stage: Genehmigt
Further away, within 1 km (8)
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)294 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Zoning change Altomontegasse314 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Nach öffentlicher Auflage
-
Public transport U2, 5. Ausbauphase775 m Planned · opening planned for 2035 Source: Stadt Wien · 21 records · checked 16 October 2026
-
Building Hermesvilla Fasadensanierung787 m Contract awarded · contract period 15 July 2026 – 11 December 2026 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 370618-2026)
- tender published (TED 402710-2026)
- tender published (TED 404834-2026)
- award published (TED 504144-2026)
- award published (TED 545267-2026)
-
Public transport Linie 15: Wienerbergtangente969 m Planned Source: Stadt Wien · 14 records · checked 16 October 2026
-
Building 1120 Wien, Am Europlatz 1-5 -Errichtung PV-Anlage970 m Contract awarded 15 October 2025 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building WN-3210080485 - HD-GDRA Wienerberg - Bau979 m Tendered · contract period 6 July 2026 – 30 September 2027 Source: TED (EU tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
History (6)
- tender published (TED 122243-2026)
- tender published (TED 122326-2026)
- tender published (TED 122485-2026)
- tender published (TED 163778-2026)
- tender published (TED 164463-2026)
- tender published (TED 166600-2026)
-
Pipes and cables 12., Kastanienallee 2_Kanalsanierung_B45928-Nr.2106990 m Contract awarded 18 December 2024 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 60–64 dB
- Quiet side
- no
Getting around
- Public transport class
- A
- Nearest stop
- Wien Computerstraße/Gutheil-Schoder-Gasse, 4 min walk, every 99 min
- Frequent service (every 10 min or more often)
- Wien Gutheil-Schoder-Gasse, 6 min walk, every 4 min
On foot
- Supermarket
- 6 min
- Pharmacy
- 12 min
- Doctor's practice
- 10 min
- Crèche
- 8 min
- Kindergarten
- 8 min
- Primary school
- 10 min
- Middle school
- 11 min
- Playground
- 8 min
Green and air
- Green and open land within 300 m
- 32 %
- Nearest park
- unnamed, 3 min walk
- Nearest forest
- unnamed, 1 min walk
- NO₂ / PM2.5, modelled 2022
- 29.2 / 10.9 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 1 · very thinly populated for Vienna
- Who lives in the neighbourhood
- 1 residents
Prices
- Apartments, average €/m² by building age
- € 3,024–4,354 (the Favoriten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →