Your address
Hackinger Straße 40
1140 Wien · 14. Penzing
The LAGE score
This building
Modest · better than 33 % of all addresses in Vienna
The neighbourhood
Hackinger Straße / Deutschordenstraße area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 47 | 5 | 87 |
| LAir quality | 44 | 44 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 58 | 49 | 53 |
| GNatural hazards | 85 | 85 | 100 |
| EEveryday amenities | 99 | 99 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 63 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 11 %
- Distance to the nearest park or forest (average)
- 190 m
- Residents
- 2,001 · more densely populated than most of Vienna
Building works and projects nearby
1 project reaches this address. 5 more projects within 1 km.
Works and changes that reach this address
-
Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)176 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
Further away, within 1 km (5)
-
Building St. Josef Krankenhaus – Bauteil 22 – Baumeisterarbeiten321 m Tendered · contract period 1 September 2025 – 1 March 2028 Source: TED (EU tenders) · 11 records · checked 10 October 2026· Found automatically. Check with the source.
History (11)
- tender published (TED 268926-2025)
- tender announced (TED 290806-2025)
- tender announced (TED 316451-2025)
- tender announced (TED 318333-2025)
- tender announced (TED 454149-2025)
- tender announced (TED 454209-2025)
- tender published (TED 526675-2025)
- tender announced (TED 547495-2025)
-
Zoning change Hackinger Straße528 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 14., Hütteldorfer Straße 268-274 - Baumeister712 m Contract awarded · contract period 23 July 2024 – 28 September 2028 · end moved 1436 days later since first listed Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 468738-2026)
- award published (TED 470183-2026)
- award published (TED 470239-2026)
- award published (TED 470297-2026)
- award published (TED 470525-2026)
- award published (TED 471319-2026)
- award published (TED 471674-2026)
- award published (TED 509727-2026)
-
Pipes and cables Wientalstraße Kreuzung Rußpekgasse und Hütteldorfer Brücke sewer works774 m Under construction · works since 24 August 2026, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables V15 Wientalquerung Düker 1. HL, 13., Preindlgasse 35816 m Tendered · contract period 20 July 2026 – 20 December 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB, rail 60–64 dB
- Quiet side
- no
Getting around
- Public transport class
- B
- Nearest stop
- Wien Cossmanngasse, 5 min walk, every 40 min
- Frequent service (every 10 min or more often)
- Wien Hütteldorf, 9 min walk, every 2 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 7 min
- Doctor's practice
- 8 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 2 min
- Middle school
- 6 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 16 %
- Nearest park
- unnamed, 2 min walk
- Nearest forest
- unnamed, 3 min walk
- NO₂ / PM2.5, modelled 2022
- 26.9 / 10.3 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- within 50 m of a flood area
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 3,573 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 3,694–5,796 (the Penzing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →