Your address
Hagedornweg 37
1220 Wien · 22. Donaustadt
The LAGE score
This building
Good · better than 89 % of all addresses in Vienna
The neighbourhood
Aurikelweg area · Good · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 95 | 95 | 87 |
| LAir quality | 54 | 54 | 46 |
| APublic transport | 78 | 78 | 90 |
| GGreen space | 83 | 82 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 77 | 87 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 0 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 81 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 36 %
- Green & open land within 300 m (average)
- 33 %
- Distance to the nearest park or forest (average)
- 184 m
- Residents
- 5,303 · less densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Roads and bridges Stadtstraße (Neubau)411 m Planned Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges Stadtstraße (Neubau)411 m Planned Source: Stadt Wien · checked 13 October 2026
-
Roads and bridges Stadtstraße Aspern433 m Approved 2018 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Roads and bridges Ostbahnbegleitstraße von Gustav-Merten-Platz und Hausfeldstraße bis Ostbahnbegleitstraße 2A road works436 m Under construction · works since 23 March 2026, planned until 23 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Linie 25: Verlängerung in die Seestadt583 m Planned Source: Stadt Wien · 49 records · checked 16 October 2026
-
New quarter Oberes Hausfeld633 m Approved 2023 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026
-
Roads and bridges S 1 (Neubau)724 m Planned Source: Stadt Wien · checked 16 October 2026
-
Roads and bridges S 1 (Neubau)724 m Planned Source: Stadt Wien · checked 13 October 2026
-
New quarter 22., Seestadt Aspern - Quartier SeeCarré781 m Planned · developer competition 2025 · 370 flats Source: Stadt Wien · checked 16 October 2026
-
Building Errichtung eines Bildungscampus, 22., Bildungscampus Seestadt Aspern III, Sonnenallee 73785 m Contract awarded 20 September 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- tender announced (TED 650075-2026)
-
Zoning change Logistikstandort Hausfeld846 m Approved · draft on public display 29 April 2026 – 10 June 2026; building freeze until 29 November 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
History (2)
- building freeze announced
- procedure stage: Genehmigt
-
New quarter 22., Am Heidjöchl919 m Planned · 5200 flats Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- below 55 dB
- Quiet side
- –
Getting around
- Public transport class
- C
- Nearest stop
- Wien Kornblumenweg, 2 min walk, every 12 min
- Frequent service (every 10 min or more often)
- Wien An den alten Schanzen, 6 min walk, every 5 min
On foot
- Supermarket
- 7 min
- Pharmacy
- 14 min
- Doctor's practice
- 6 min
- Crèche
- 5 min
- Kindergarten
- 5 min
- Primary school
- 16 min
- Middle school
- 20 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 35 %
- Nearest park
- Parkanlage An den alten Schanzen, 6 min walk
- Nearest forest
- unnamed, 3 min walk
- NO₂ / PM2.5, modelled 2022
- 23.8 / 12.8 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 1,206 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 3,653–5,214 (the Donaustadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →