Your address
Hansenstraße 1
1010 Wien · 1. Innere Stadt
The LAGE score
This building
Modest · better than 31 % of all addresses in Vienna
The neighbourhood
Bellariastraße area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 39 | 17 | 87 |
| LAir quality | 25 | 25 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 69 | 67 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 97 | 97 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 100 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 20 %
- Distance to the nearest park or forest (average)
- 77 m
- Protection zone (Schutzzone)
- 100 %
- Residents
- 81 · less densely populated than most of Vienna
Building works and projects nearby
2 projects reach this address. 12 more projects within 1 km.
Works and changes that reach this address
-
Public transport Volksgartenstraße 2 U-Bahn construction48 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1010 Wien, Schmerlingplatz 10-11, Justizpalast - Gebäudekühlung - Einleitung der Fernkälte - hochbauliche Arbeiten125 m Contract awarded 14 May 2025 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
Further away, within 1 km (12)
-
Roads and bridges Burggasse 25 bis 45 road works404 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport U2, 4. Ausbauphase448 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Building 1060 Wien, Getreidemarkt 9- Baumeisterarbeiten (Zaunsanierung)456 m Contract awarded 2 September 2026 Source: Kerndaten (public tenders) · 13 records · checked 10 October 2026· Found automatically. Check with the source.
History (13)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Baumeisterarbeiten Fassadeninstandsetzung, Amtshaus 1010 Wien, Lichtenfelsgasse 2, HOF 2497 m Contract awarded 7 July 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (IFG)
- award published (IFG)
-
Roads and bridges Landesgerichtsstraße 6 bis Felderstraße road works505 m Under construction · works since 14 September 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building E90094/196/0-Dion7/2025, 1070 Wien, Stiftgasse 2-2A, Stift Kaserne, Obj. 001 - Mosertrakt, Instandsetzung - Trockenlegung, Baumeisterarbeiten506 m Contract awarded 3 February 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Public transport U-Bahn-Linie U2, Bauabschnitt U2/22 "Rathaus" und U-Bahn-Linie U5, Bauabschnitt U5/2 "Frankhplatz"548 m Contract awarded 5 June 2024 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 86 records · checked 10 October 2026· Found automatically. Check with the source.
History (86)
- award published (TED 462671-2026)
- award published (TED 463367-2026)
- award published (TED 537334-2026)
- award published (TED 538501-2026)
- award published (TED 538906-2026)
- award published (TED 539471-2026)
- award published (TED 539695-2026)
- award published (TED 540130-2026)
-
Public transport Stahlbauarbeiten U-Bahn-Linie U2 Bauabschnitt U2/17 „TVM-Vortriebe“, U2/19 „Reinprechtsdorfer Straße“, U2/20„Pilgramgasse“, U2/21 „Neubaugasse“ und U2/22 „Rathaus“548 m Contract awarded · since 1 January 2026 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (TED 653337-2023)
- tender published (TED 181319-2025)
- tender published (TED 525131-2025)
- tender published (TED 817496-2025)
- award published (TED 288442-2026)
- tender published (TED 393288-2026)
- tender published (TED 445680-2026)
- award published (TED 550551-2026)
-
Building 1010 Wien, Minoritenplatz 9, Generalsanierung Minoritenplatz 9, Lüftungsinstallationen572 m Contract awarded · contract period 1 March 2025 – 1 March 2029 · end moved 396 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 144 records · checked 15 October 2026· Found automatically. Check with the source.
History (144)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- award published (TED 678286-2026)
- award published (TED 678734-2026)
- award published (TED 680297-2026)
-
Public transport U5, 4. Ausbauphase589 m Planned · opening planned for 2030 Source: Stadt Wien · 21 records · checked 16 October 2026
-
Roads and bridges 6., Windmühlgasse u.a.591 m Contract awarded · contract period 1 September 2026 – 22 October 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 451515-2026)
- tender published (TED 518208-2026)
- award published (TED 672839-2026)
-
Public transport Mariahilfer Straße von Stiftgasse bis Erika-Weinzierl-Platz und Kirchengasse track works643 m Under construction · works since 28 February 2021, planned until 31 December 2029 Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 65–69 dB, rail 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Schmerlingplatz/Volkstheater U, 1 min walk, every 14 min
- Frequent service (every 10 min or more often)
- Wien Volkstheater, 1 min walk, every 1 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 7 min
- Doctor's practice
- 1 min
- Crèche
- 4 min
- Kindergarten
- 4 min
- Primary school
- 6 min
- Middle school
- 13 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 22 %
- Nearest park
- Grete-Rehor-Park, 1 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 32.5 / 11.5 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- old-town zone, UNESCO World Heritage
Residents
- Residents within 300 m
- 533 · less densely populated than most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; more older people; fewer children
Prices
- Apartments, average €/m² by building age
- € 7,077–9,477 (the Innere Stadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →