Your address
Hartmanngasse 2B
1050 Wien · 5. Margareten
The LAGE score
This building
Fair · better than 66 % of all addresses in Vienna
The neighbourhood
Hartmanngasse area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 87 | 87 |
| LAir quality | 34 | 34 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 54 | 53 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 28 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 4 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 10 %
- Distance to the nearest park or forest (average)
- 50 m
- Protection zone (Schutzzone)
- 51 %
- Residents
- 1,124 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Zoning change Bacherplatz194 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse240 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Building 1050 Wien, Kriehubergasse 26, Zubau Turnsaalzentrum, Fenstersanierung Bestand249 m Contract awarded · contract period 3 March 2025 – 2 July 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 56 records · checked 10 October 2026· Found automatically. Check with the source.
History (56)
- award published (Kerndaten)
- tender published (TED 749897-2025)
- tender published (TED 783968-2025)
- award published (TED 166000-2026)
- award published (TED 166602-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Pipes and cables Zentagasse 22 bis 46 pipe laying327 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building 1040 Wien, Favoritenstraße 9-11- Sanierungsarbeiten-Hofgebäude- Gartenzubau642 m Contract awarded 3 June 2026 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)647 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction647 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction667 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Wien 4., Belvederegasse ONr. 2-42 - Wasserrohrauswechslung - Erd- u. Baumeisterarbeiten668 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Public transport U2, 4. Ausbauphase668 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 04., Preßgasse 7 - Baumeister700 m Contract awarded 27 November 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer722 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Leibenfrostgasse, 2 min walk, every 5 min
- Frequent service (every 10 min or more often)
- Wien Leibenfrostgasse, 2 min walk, every 5 min
On foot
- Supermarket
- 3 min
- Pharmacy
- 4 min
- Doctor's practice
- 2 min
- Crèche
- 4 min
- Kindergarten
- 1 min
- Primary school
- 1 min
- Middle school
- 8 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 10 %
- Nearest park
- Rudolf-Sallinger-Park, 1 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 29.7 / 11.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 6,906 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- fewer children
Prices
- Apartments, average €/m² by building age
- € 4,325–5,370 (the Margareten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →