Your address

Hauptallee W

1020 Wien · 2. Leopoldstadt

The outline marks the neighbourhood Am grünen Prater area, with 122 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 58 % of all addresses in Vienna

The neighbourhood

Am grünen Prater area · Good · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 75 9587
LAir quality 35 4346
APublic transport 78 10090
GGreen space 100 8553
GNatural hazards 100 100100
EEveryday amenities 64 9097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
4 % of addresses
Free of mapped noise ≥ 55 dB at the building
52 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
90 %
Green & open land within 300 m (average)
33 %
Distance to the nearest park or forest (average)
80 m
Protection zone (Schutzzone)
6 %
Residents
2,380 · less densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 6 more projects within 1 km.

Further away, within 1 km (6)
  • Building FBT I Rahmenvereinbarung für Bauleistungen für den Neubau des zentralen Fernbus-Terminal in 1020 Wien, Stephanie-Endres-Straße 5
    786 m Contract awarded · contract period 17 June 2024 – 31 December 2029 · end moved 152 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
    History (12)
    1. award published (TED 389674-2025)
    2. award published (TED 390221-2025)
    3. award published (TED 643103-2025)
    4. award published (Kerndaten)
    5. award published (TED 692478-2025)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (TED 615888-2026)
  • Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU
    789 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Roads and bridges Meiereistraße von Olympiaplatz und Engerthstraße und Stephanie-Endres-Straße bis Handelskai road works
    856 m Under construction · works since 11 October 2026, planned until 13 November 2026 Source: Stadt Wien · checked 16 October 2026
  • Building 1020 Wien, Welthandelsplatz 1, WU - Campus - Errichtung einer gebrauchsfertigen PV- Anlage
    910 m Tendered 6 December 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Linie 18 – Bauleistung Gleisbau Neubau
    926 m Tendered 23 January 2025 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 732865-2024)
    2. tender published (TED 761692-2024)
    3. tender published (TED 792565-2024)
    4. tender published (TED 48362-2025)
  • Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287
    994 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
    History (24)
    1. award published (TED 197646-2026)
    2. award published (TED 204964-2026)
    3. award published (TED 218285-2026)
    4. award published (TED 239657-2026)
    5. award published (TED 287541-2026)
    6. award published (TED 411646-2026)
    7. award published (TED 524521-2026)
    8. award published (TED 644329-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
no

Getting around

Public transport class
C
Nearest stop
Wien Ernst-Happel-Stadion, 8 min walk, every 6 min
Frequent service (every 10 min or more often)
Wien Ernst-Happel-Stadion, 8 min walk, every 6 min

On foot

Supermarket
12 min
Pharmacy
16 min
Doctor's practice
more than 1.0 km away
Crèche
13 min
Kindergarten
12 min
Primary school
13 min
Middle school
16 min
Playground
3 min

Green and air

Green and open land within 300 m
78 %
Nearest park
Prater, 1 min walk
Nearest forest
unnamed, 1 min walk
NO₂ / PM2.5, modelled 2022
19.6 / 12.4 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
data missing
Protection zones
outside all zones

Residents

Residents within 300 m
0 · very thinly populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 4,603–6,369 (the Leopoldstadt district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →