Your address

Haydngasse 1

1060 Wien · 6. Mariahilf

The outline marks the neighbourhood Haydngasse area, with 74 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 54 % of all addresses in Vienna

The neighbourhood

Haydngasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 8787
LAir quality 47 4746
APublic transport 90 10090
GGreen space 43 4153
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
32 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
4 %
Distance to the nearest park or forest (average)
138 m
Protection zone (Schutzzone)
50 %
Residents
1,351 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10
    165 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    391 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)
  • Building Generalunternehmerleistungen für die Generalsanierung einer Schule in der Mittelgasse 24 / Spalowskygasse 5, 1060 Wien; Zusatzleistungen hinsichtlich eines Dachausbaus
    448 m Contract awarded 4 November 2024 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister
    525 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau
    531 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 465942-2026)
    2. tender published (TED 487766-2026)
    3. tender published (TED 490200-2026)
    4. tender published (TED 496163-2026)
    5. tender published (TED 593204-2026)
    6. tender published (TED 704637-2026)
  • Public transport U2, 4. Ausbauphase
    556 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building 1060 Wien, Amerlingstraße 6 / Küchenumbau / Baumeisterarbeiten
    578 m Contract awarded 27 May 2025 Source: Kerndaten (public tenders) · 12 records · checked 10 October 2026· Found automatically. Check with the source.
    History (12)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Pipes and cables Linke Wienzeile 90-92 sewer works
    588 m Under construction · works since 19 May 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Bacherplatz
    626 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction
    632 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
    History (4)
    1. award published (TED 475971-2022)
    2. tender published (TED 829936-2025)
    3. tender published (TED 585716-2026)
    4. listed by the city
  • Building 07., Apollogasse
    716 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
  • Zoning change Plandokument 8414: Gebiet zwischen Ullmannstraße, Karl-Walther-Gasse, Graumanngasse und Pfeiffergasse
    805 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Hirschengasse, 3 min walk, every 8 min
Frequent service (every 10 min or more often)
Wien Hirschengasse, 3 min walk, every 8 min

On foot

Supermarket
4 min
Pharmacy
4 min
Doctor's practice
1 min
Crèche
2 min
Kindergarten
2 min
Primary school
3 min
Middle school
3 min
Playground
2 min

Green and air

Green and open land within 300 m
4 %
Nearest park
Hubert-Marischka-Park, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
25.9 / 11.0 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
7,985 · very densely populated for Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,708–5,445 (the Mariahilf district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →