Your address
Heinestraße 35
1020 Wien · 2. Leopoldstadt
The LAGE score
This building
Fair · better than 41 % of all addresses in Vienna
The neighbourhood
Heinestraße area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 53 | 87 |
| LAir quality | 37 | 32 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 36 | 37 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 50 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 6 %
- Distance to the nearest park or forest (average)
- 286 m
- Protection zone (Schutzzone)
- 27 %
- Residents
- 1,073 · more densely populated than most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)142 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
History (11)
- award published (Kerndaten)
- award published (TED 375124-2026)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
- tender published (Kerndaten)
-
Public transport ÖBB Wohnprogramm, 1020 Wien, Mühlfeldgasse 15 & 16 - Generalunternehmerleistungen Bau187 m Contract awarded 23 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure226 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Nordbahnstraße von Alliiertenstraße bis Am Tabor pipe laying458 m Under construction · works since 26 July 2026, planned until 1 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287508 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 197646-2026)
- award published (TED 204964-2026)
- award published (TED 218285-2026)
- award published (TED 239657-2026)
- award published (TED 287541-2026)
- award published (TED 411646-2026)
- award published (TED 524521-2026)
- award published (TED 644329-2026)
-
Public transport Linie 29: Augarten533 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Kanalsanierung und Hybridanlage - Schule Wien 2, Vereinsgasse 29549 m Contract awarded 12 December 2025 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Building Generalunternehmerleistungen, Amtshaus 1020 Wien, Karmelitergasse 9, Generalinstandsetzung inkl. Dachgeschossausbau701 m Tendered · contract period 28 July 2027 – 19 July 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure750 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Heizung, Klimatechnik, Lüftung und Sanitär781 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 629712-2025)
- tender published (TED 701861-2025)
- tender published (TED 705095-2025)
-
Building Abbrucharbeiten, Schule 1020 Wien, Schwarzingergasse 4783 m Contract awarded · contract period 13 July 2026 – 14 December 2026 Source: TED (EU tenders), data.gv.at (information requests), Kerndaten (public tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
History (4)
- tender published (TED 257419-2026)
- award published (TED 484683-2026)
- award published (Kerndaten)
- award published (IFG)
-
Building 20., Nordwestbahnhof – Phase A.2808 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Kleine Stadtgutgasse, 1 min walk, every 18 min
- Frequent service (every 10 min or more often)
- Wien Rueppgasse, 3 min walk, every 9 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 1 min
- Doctor's practice
- 1 min
- Crèche
- 3 min
- Kindergarten
- 2 min
- Primary school
- 3 min
- Middle school
- 5 min
- Playground
- 1 min
Green and air
- Green and open land within 300 m
- 5 %
- Nearest park
- Odeonpark, 4 min walk
- Nearest forest
- unnamed, 11 min walk
- NO₂ / PM2.5, modelled 2022
- 28.9 / 11.6 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- core / mixed use
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 7,489 · very densely populated for Vienna
- Who lives in the neighbourhood
- a typical age mix for Vienna
Prices
- Apartments, average €/m² by building age
- € 4,603–6,369 (the Leopoldstadt district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →