Your address

Hernalser Hauptstraße 78

1170 Wien · 17. Hernals

The outline marks the neighbourhood Rötzergasse area, with 97 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 3 % of all addresses in Vienna

The neighbourhood

Rötzergasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 1787
LAir quality 23 2346
APublic transport 100 10090
GGreen space 49 4653
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
70 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
7 %
Distance to the nearest park or forest (average)
125 m
Protection zone (Schutzzone)
48 %
Residents
2,258 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

3 projects reach this address. 1 new station is planned within walking distance. 6 more projects within 1 km.

New stations nearby

Works and changes that reach this address

Further away, within 1 km (6)
  • Pipes and cables Martinstraße von Kreuzung Leo-Slezak-Gasse bis Kreuzung Blumengasse pipe laying
    701 m Under construction · works since 5 October 2026, planned until 18 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Baumeisterarbeiten, Schule 1180 Wien, Klettenhofergasse 3
    923 m Contract awarded 26 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Lidlgasse 1 bis 7 pipe laying
    940 m Under construction · works since 13 July 2026, planned until 17 September 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Transportrohrstrang 5. HL-BA02 PH01 DN/ID 800 - 1170 Wien, Wattgasse - Lidlgasse 1-7
    948 m Tendered · contract period 23 February 2026 – 1 September 2027 Source: TED (EU tenders) · 4 records · checked 10 October 2026· Found automatically. Check with the source.
    History (4)
    1. tender published (TED 798007-2025)
    2. tender published (TED 839822-2025)
    3. tender published (TED 108964-2026)
    4. tender published (TED 158861-2026)
  • Building 1180 Wien, Klostergasse 25, Funktionssanierung und Erweiterung AHS Klostergasse, Baumeisterarbeiten
    967 m Contract awarded · contract period 1 September 2024 – 30 October 2026 · end moved 183 days later since first listed Source: TED (EU tenders) · 22 records · checked 10 October 2026· Found automatically. Check with the source.
    History (22)
    1. tender published (TED 110884-2025)
    2. award published (TED 233865-2025)
    3. tender published (TED 381244-2025)
    4. tender published (TED 429755-2025)
    5. award published (TED 500364-2025)
    6. award published (TED 500427-2025)
    7. award published (TED 635578-2025)
    8. award published (TED 635897-2025)
  • Building Stadt Wien - Wiener Wohnen - 18., Lacknergasse 96 - Baumeister
    980 m Contract awarded 25 June 2026 Source: Kerndaten (public tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Elterleinplatz, 1 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Elterleinplatz, 1 min walk, every 3 min

On foot

Supermarket
1 min
Pharmacy
1 min
Doctor's practice
1 min
Crèche
1 min
Kindergarten
1 min
Primary school
2 min
Middle school
8 min
Playground
5 min

Green and air

Green and open land within 300 m
7 %
Nearest park
Parkanlage Ortliebgasse, 1 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
33.0 / 10.8 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
old-town zone

Residents

Residents within 300 m
6,560 · more densely populated than most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna

Prices

Apartments, average €/m² by building age
€ 3,760–5,687 (the Hernals district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →