Your address

Högelmüllergasse 13

1050 Wien · 5. Margareten

The outline marks the neighbourhood Högelmüllergasse area, with 98 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 24 % of all addresses in Vienna

The neighbourhood

Högelmüllergasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 8787
LAir quality 12 1246
APublic transport 90 9090
GGreen space 47 4653
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
17 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
10 %
Distance to the nearest park or forest (average)
240 m
Residents
1,635 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 1 new station is planned within walking distance. 12 more projects within 1 km.

New stations nearby

Works and changes that reach this address

Further away, within 1 km (12)
  • Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026
    153 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction
    361 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Bacherplatz
    362 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Öffentliche Auflage
  • Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer
    445 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 636999-2024)
    2. award published (TED 210517-2025)
    3. award published (Kerndaten)
  • Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz
    503 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. tender published (TED 204996-2022)
    2. tender published (TED 375263-2023)
    3. award published (TED 607779-2023)
    4. tender published (TED 310837-2024)
    5. tender published (TED 243424-2025)
  • Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse
    505 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
  • Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction
    512 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Matzleinsdorfer Platz unter Tragwerk ÖBB U-Bahn construction
    524 m Under construction · works since 14 March 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Zweigleisiger Ausbau der Pottendorfer Linie Abschnitt Wien Meidling - Abzweigung Altmannsdorf (ÖBB Strecken, 10601, 10615, 10616)
    594 m Approved 2021 Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Pipes and cables Zentagasse 22 bis 46 pipe laying
    610 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction
    797 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
    History (4)
    1. award published (TED 475971-2022)
    2. tender published (TED 829936-2025)
    3. tender published (TED 585716-2026)
    4. listed by the city
  • Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau
    871 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. tender published (TED 116012-2019)
    2. notice changed (TED 142519-2019)
    3. award published (TED 28914-2021)
    4. award published (TED 21980-2022)
    5. award published (TED 239588-2022)
    6. award published (TED 606170-2022)
    7. award published (TED 680150-2025)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Embelgasse, 3 min walk, every 20 min
Frequent service (every 10 min or more often)
Wien Fendigasse, 3 min walk, every 6 min

On foot

Supermarket
1 min
Pharmacy
4 min
Doctor's practice
2 min
Crèche
4 min
Kindergarten
3 min
Primary school
3 min
Middle school
8 min
Playground
3 min

Green and air

Green and open land within 300 m
11 %
Nearest park
Einsiedlerpark, 4 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
36.3 / 11.2 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
10,075 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; more people between 15 and 29; fewer children

Prices

Apartments, average €/m² by building age
€ 4,325–5,370 (the Margareten district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →