Your address

Kaiserstraße 84

1070 Wien · 7. Neubau

The outline marks the neighbourhood Halbgasse area, with 55 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 1 % of all addresses in Vienna

The neighbourhood

Halbgasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 5 1787
LAir quality 0 046
APublic transport 100 10090
GGreen space 55 5053
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
76 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
13 %
Distance to the nearest park or forest (average)
223 m
Protection zone (Schutzzone)
24 %
Residents
1,040 · very densely populated for Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 9 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (9)
  • Roads and bridges Albertgasse von Kreuzung Josef-Matthias-Hauer-Platz und Josefstädter Straße bis Kreuzung Florianigas road works
    341 m Under construction · works since 12 October 2026, planned until 1 September 2027 Source: Stadt Wien · 14 records · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 08., Pfeilgasse 47-49 - Baumeister
    406 m Contract awarded · contract period 19 February 2025 – 1 May 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 36 records · checked 10 October 2026· Found automatically. Check with the source.
    History (36)
    1. award published (TED 318339-2025)
    2. award published (Kerndaten)
    3. award published (TED 435301-2025)
    4. award published (TED 435576-2025)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 622720-2025)
    8. award published (Kerndaten)
  • Roads and bridges Burggasse 67 road works
    633 m Under construction · works since 27 July 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Florianigasse 2- 210 Baumeisterarbeiten
    721 m Contract awarded · contract period 23 March 2026 – 23 January 2028 Source: TED (EU tenders) · 20 records · checked 10 October 2026· Found automatically. Check with the source.
    History (20)
    1. award published (TED 126123-2026)
    2. award published (TED 126473-2026)
    3. award published (TED 126642-2026)
    4. award published (TED 191101-2026)
    5. award published (TED 192384-2026)
    6. award published (TED 278223-2026)
    7. award published (TED 278477-2026)
    8. award published (TED 278637-2026)
  • Building 07., Apollogasse
    835 m Planned · developer competition 2020 · 159 flats Source: Stadt Wien · checked 16 October 2026
  • Public transport U2, 4. Ausbauphase
    848 m Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
  • Building Baumeisterarbeiten (Raumbereitstellung für das Arbeitsmedizinische Zentrum, Fenstersanierung, Brandschutz, WADG und IKT), Amtshaus 1080 Wien, Schlesingerplatz 2-4
    916 m Contract awarded · contract period 4 December 2023 – 31 March 2028 · end moved 238 days later since first listed Source: TED (EU tenders), Kerndaten (public tenders) · 56 records · checked 10 October 2026· Found automatically. Check with the source.
    History (56)
    1. award published (Kerndaten)
    2. award published (TED 543608-2025)
    3. award published (Kerndaten)
    4. award published (TED 611483-2025)
    5. award published (Kerndaten)
    6. tender published (TED 42642-2026)
    7. award published (TED 221985-2026)
    8. award published (Kerndaten)
  • Public transport Kirchengasse 1 bis 30 U-Bahn construction
    966 m Under construction · works since 28 February 2021, planned until 31 December 2029 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Mein Gesundheitszentrum Neubau - Teil-Generalunternehmer Rohbau
    994 m Tendered · contract period 15 September 2026 – 4 December 2030 Source: TED (EU tenders) · 6 records · checked 16 October 2026· Found automatically. Check with the source.
    History (6)
    1. tender published (TED 465942-2026)
    2. tender published (TED 487766-2026)
    3. tender published (TED 490200-2026)
    4. tender published (TED 496163-2026)
    5. tender published (TED 593204-2026)
    6. tender published (TED 704637-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road ≥ 75 dB, rail 65–69 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Neustiftgasse/Kaiserstraße, 1 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Neustiftgasse/Kaiserstraße, 1 min walk, every 4 min

On foot

Supermarket
1 min
Pharmacy
2 min
Doctor's practice
2 min
Crèche
4 min
Kindergarten
1 min
Primary school
2 min
Middle school
2 min
Playground
3 min

Green and air

Green and open land within 300 m
15 %
Nearest park
Josef-Strauß-Park, 3 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
42.7 / 11.2 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
7,093 · very densely populated for Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer children and older people

Prices

Apartments, average €/m² by building age
€ 4,849–6,214 (the Neubau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →