Your address

Kannegasse 6

1150 Wien · 15. Rudolfsheim-Fünfhaus

The outline marks the neighbourhood Pilgerimgasse area, with 110 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 47 % of all addresses in Vienna

The neighbourhood

Pilgerimgasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 67 6787
LAir quality 32 3246
APublic transport 100 10090
GGreen space 50 4953
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
34 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
15 %
Distance to the nearest park or forest (average)
334 m
Residents
1,967 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Public transport Märzstraße 49 bis Kreuzung Huglgasse sowie Kreuzung Huglgasse bis Kreuzung Hütteldorfer Straße track works
    186 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Oeverseestraße
    309 m Approved · draft on public display 27 May 2026 – 24 June 2026; building freeze until 27 December 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Genehmigt
  • Building 1150 Wien, Auf der Schmelz 4, LED-Beleuchtung und abgehängte Decken, Abbrucharbeiten Bauphase 2026
    445 m Contract awarded 2 June 2026 Source: Kerndaten (public tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
    History (7)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
  • Zoning change Johnstraße
    488 m Approved · draft on public display 6 May 2026 – 17 June 2026; building freeze until 6 December 2026 Source: Stadt Wien · 2 records · checked 15 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Genehmigt
  • Zoning change Meiselstraße
    625 m Zoning in progress · draft on public display 5 August 2026 – 16 September 2026; building freeze until 5 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage
  • Building 25-005.417 GU Baumeister- und Sportbauarbeiten (USZ Turnsaalsanierung)
    638 m Contract awarded · contract period 14 July 2025 – 20 November 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 292904-2025)
    2. award published (TED 466805-2025)
  • Building 1150 Wien, Auf der Schmelz 6a - Errichtung einer Brandmeldeanlage
    773 m Contract awarded 22 July 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building 1150 Wien Avedikstr - Tausch von ca 85 lfm Fernheizleitungen - Tiefbauarbeiten und Fernheizleitungstausch
    795 m Contract awarded 19 September 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges 15., Wickhoffgasse 14 - Hufeisenhof
    873 m Contract awarded · contract period 15 June 2027 – 15 August 2029 Source: TED (EU tenders) · 26 records · checked 10 October 2026· Found automatically. Check with the source.
    History (26)
    1. tender published (TED 412435-2024)
    2. award published (TED 442251-2024)
    3. award published (TED 539673-2024)
    4. award published (TED 564962-2024)
    5. tender published (TED 607029-2024)
    6. tender withdrawn (TED 643704-2024)
    7. award published (TED 717911-2024)
    8. tender published (TED 662090-2026)
  • New quarter Spallartgasse
    909 m Approved 2018 Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges Mariahilfer Straße von Linzer Straße und Anschützgasse und Zollernsperggasse bis Sperrgasse und Talg road works
    971 m Under construction · works since 13 April 2026, planned until 30 April 2027 Source: Stadt Wien, TED (EU tenders), Kerndaten (public tenders) · 30 records · checked 16 October 2026
    History (10)
    1. award published (Kerndaten)
    2. tender published (TED 862003-2025)
    3. tender published (TED 247267-2026)
    4. award published (TED 256589-2026)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (TED 552509-2026)
    8. listed by the city
  • Building 1160 Wien, Herbststraße 104, Sanierung/Neugestaltung WC Anlagen - Baumeisterarbeiten Bauteil Ost
    985 m Contract awarded 20 March 2025 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
    History (10)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Huglgasse, 4 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Huglgasse, 4 min walk, every 4 min

On foot

Supermarket
3 min
Pharmacy
4 min
Doctor's practice
2 min
Crèche
3 min
Kindergarten
1 min
Primary school
6 min
Middle school
5 min
Playground
4 min

Green and air

Green and open land within 300 m
17 %
Nearest park
Forschneritschpark, 6 min walk
Nearest forest
–
NO₂ / PM2.5, modelled 2022
30.5 / 10.9 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
6,503 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 3,591–4,905 (the Rudolfsheim-Fünfhaus district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →