Your address
Kohlgasse 40
1050 Wien · 5. Margareten
The LAGE score
This building
Fair · better than 38 % of all addresses in Vienna
The neighbourhood
Embelgasse / Margaretenstraße area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 67 | 87 | 87 |
| LAir quality | 29 | 29 | 46 |
| APublic transport | 90 | 90 | 90 |
| GGreen space | 50 | 52 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 13 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 4 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 10 %
- Distance to the nearest park or forest (average)
- 79 m
- Residents
- 1,353 · very densely populated for Vienna
Building works and projects nearby
2 projects reach this address. 1 new station is planned within walking distance. 12 more projects within 1 km.
New stations nearby
-
Public transport New station Reinprechtsdorfer Straße (U2)213 m U2, 4. Ausbauphase · Under construction · opening planned for 2030 Source: Stadt Wien · 42 records · checked 16 October 2026
Works and changes that reach this address
-
Public transport Siebenbrunnengasse von Kreuzung Siebenbrunnenplatz und Reinprechtsdorfer Straße bis 44 U-Bahn construction223 m Under construction · works since 28 February 2021, planned until 31 December 2026 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport Bacherplatz von Arbeitergasse bis Schwarzhorngasse U-Bahn construction240 m Under construction · works since 28 February 2021, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
Further away, within 1 km (12)
-
Building WWSPEN-Wohnhaus Spengergasse 45 - Totalsanierung – Umbau und Aufstockung - Generalunternehmer189 m Contract awarded · contract period 27 March 2025 – 15 February 2027 Source: TED (EU tenders), Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 636999-2024)
- award published (TED 210517-2025)
- award published (Kerndaten)
-
Zoning change Bacherplatz201 m Zoning in progress · draft on public display 14 October 2026 – 25 November 2026; building freeze until 14 May 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
History (2)
- building freeze announced
- procedure stage: Öffentliche Auflage
-
Building 1050 Wien, Reinprechtsdorfer Str. 24-26, Baumeister Teil GU, abgehängte Decke, Bauphase 2025 und 2026262 m Contract awarded 8 April 2026 Source: Kerndaten (public tenders) · 10 records · checked 10 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Zoning change Plandokument 8489: Gebiet zwischen Castelligasse, Gartengasse, Linienzug 1-3, Linienzug 3-4 (Viktor-Christ-Gasse) und Zentagasse381 m Zoning in progress 8 June 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Public transport Rechte Wienzeile von Kreuzung Ramperstorffergasse bis Kreuzung Pilgramgasse und Pilgrambrücke U-Bahn construction497 m Under construction · works since 28 February 2021, planned until 31 May 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien, TED (EU tenders) · 10 records · checked 16 October 2026
History (4)
- award published (TED 475971-2022)
- tender published (TED 829936-2025)
- tender published (TED 585716-2026)
- listed by the city
-
Pipes and cables Zentagasse 22 bis 46 pipe laying502 m Under construction · works since 31 August 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Public transport U-Bahn-Linie U2, Bauabschnitte U2/17-U2/21; Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau554 m Contract awarded 16 September 2025 · part of U2, 4. Ausbauphase Source: TED (EU tenders) · 7 records · checked 10 October 2026· Found automatically. Check with the source.
History (7)
- tender published (TED 116012-2019)
- notice changed (TED 142519-2019)
- award published (TED 28914-2021)
- award published (TED 21980-2022)
- award published (TED 239588-2022)
- award published (TED 606170-2022)
- award published (TED 680150-2025)
-
Building 1060 Wien, Webg. 2a - Sanierung, Bestandssanierung, Generalsanierung ME 4 / Top 10670 m Contract awarded 16 June 2025 Source: Kerndaten (public tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building KH BHS - MR - Baumeister732 m Tendered · contract period 1 March 2027 – 30 June 2028 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 523155-2026)
- tender published (TED 523852-2026)
- tender published (TED 525201-2026)
-
Building MOLL - Mollardgasse 87 - brandschutztechnische Verbesserungsmaßnahmen - Gewerk Baumeister767 m Contract awarded 24 October 2024 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Roads and bridges Wende- und Abstellanlage Matzleinsdorfer Platz808 m Contract awarded · since 10 January 2024 Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 204996-2022)
- tender published (TED 375263-2023)
- award published (TED 607779-2023)
- tender published (TED 310837-2024)
- tender published (TED 243424-2025)
-
Public transport Matzleinsdorfer Platz 3-4 bis 5 U-Bahn construction818 m Under construction · works since 27 March 2022, planned until 31 December 2028 · part of U2, 4. Ausbauphase Source: Stadt Wien · 7 records · checked 16 October 2026
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- B
- Nearest stop
- Wien Kohlgasse, 1 min walk, every 20 min
- Frequent service (every 10 min or more often)
- Wien Reinprechtsdorfer Straße/Arbeitergasse, 2 min walk, every 4 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 2 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 4 min
- Middle school
- 6 min
- Playground
- 3 min
Green and air
- Green and open land within 300 m
- 10 %
- Nearest park
- Einsiedlerpark, 2 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 31.2 / 10.9 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 8,131 · very densely populated for Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; fewer older people
Prices
- Apartments, average €/m² by building age
- € 4,325–5,370 (the Margareten district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →