Your address

Kollergasse 20

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Bechardgasse area, with 84 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Modest · better than 26 % of all addresses in Vienna

The neighbourhood

Bechardgasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 8787
LAir quality 29 2946
APublic transport 90 9090
GGreen space 23 2353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
2 % of addresses
Free of mapped noise ≥ 55 dB at the building
1 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
1 %
Distance to the nearest park or forest (average)
482 m
Protection zone (Schutzzone)
94 %
Residents
1,470 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Building Stadt Wien - Wiener Wohnen - 03., Lorbeergasse 6- Baumeister
    197 m Contract awarded 23 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
    History (6)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
  • Building 1030 Wien, Hetzgasse 2, Fassadensanierung - Baumeisterarbeiten und WDVS
    310 m Tendered 14 October 2026 Source: Kerndaten (public tenders) · checked 15 October 2026· Found automatically. Check with the source.
  • Public transport Vordere Zollamtsstraße von Marxergasse und Kleine Marxerbrücke bis Unbenannte Verkehrsfläche und Rad track works
    411 m Under construction · works since 1 February 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Große Ungarbrücke von Kreuzung Rechte Bahngasse und Am Heumarkt und Am Stadtpark bis Kreuzung Ungarg bridge works
    479 m Under construction · works since 16 August 2026, planned until 31 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)
    494 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Rotundenbrücke von Kreuzung Schüttelstraße und Wittelsbachstraße bis Kreuzung Erdberger Lände und We pipe laying
    534 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU
    641 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Pipes and cables Wittelsbachstraße von Kreuzung Schüttelstraße und Rotundenbrücke bis Kreuzung Böcklinstraße pipe laying
    649 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Wien 2., Wittelsbachstr. v. Rotundenbrücke b. Böcklinstraße u. 3., Plateau Rasumofskyg. / Rotundenbrücke / Weißgerberlände - Erd- u. Baumeisterarbeiten
    668 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (IFG)
    2. award published (IFG)
  • Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure
    708 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1020 Wien, Wittelsbachstraße 5, Thermische Sanierung inkl. Dekabonisierung, Bundes-Blindeninstitut, Baumeister Teil-GU
    729 m Contract awarded 25 September 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Building 1010 Wien, Wollzeile 27A, ASCC – Austrian Science Communication Center - Teil-GU Bau
    886 m Contract awarded · contract period 10 April 2026 – 28 February 2027 · end moved 6 days later since first listed Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. tender published (TED 109035-2026)
    2. tender published (TED 133461-2026)
    3. tender published (TED 229603-2026)
    4. tender published (TED 292148-2026)
    5. tender published (TED 310314-2026)
    6. award published (TED 470005-2026)
    7. award published (TED 504962-2026)
    8. award published (TED 505127-2026)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Marxergasse, 3 min walk, every 6 min
Frequent service (every 10 min or more often)
Wien Marxergasse, 3 min walk, every 6 min

On foot

Supermarket
3 min
Pharmacy
1 min
Doctor's practice
2 min
Crèche
1 min
Kindergarten
1 min
Primary school
5 min
Middle school
8 min
Playground
2 min

Green and air

Green and open land within 300 m
3 %
Nearest park
Stadtpark-Kinderpark, 8 min walk
Nearest forest
unnamed, 13 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.7 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
old-town zone

Residents

Residents within 300 m
6,194 · more densely populated than most of Vienna
Who lives in the neighbourhood
older residents than in most of Vienna; more older people; fewer people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →