Your address

Kolonitzgasse 10

1030 Wien · 3. Landstraße

The outline marks the neighbourhood Hetzgasse / Matthäusgasse area, with 43 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 17 % of all addresses in Vienna

The neighbourhood

Hetzgasse / Matthäusgasse area · Modest · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 32 3287
LAir quality 29 5646
APublic transport 100 10090
GGreen space 31 3253
GNatural hazards 100 100100
EEveryday amenities 97 9797

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
30 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
2 %
Distance to the nearest park or forest (average)
273 m
Residents
450 · more densely populated than most of Vienna
The neighbourhood report →

Building works and projects nearby

2 projects reach this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Public transport Vordere Zollamtsstraße von Marxergasse und Kleine Marxerbrücke bis Unbenannte Verkehrsfläche und Rad track works
    309 m Under construction · works since 1 February 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure
    425 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU
    568 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
  • Pipes and cables Rotundenbrücke von Kreuzung Schüttelstraße und Wittelsbachstraße bis Kreuzung Erdberger Lände und We pipe laying
    721 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges Große Ungarbrücke von Kreuzung Rechte Bahngasse und Am Heumarkt und Am Stadtpark bis Kreuzung Ungarg bridge works
    726 m Under construction · works since 16 August 2026, planned until 31 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)
    747 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Roads and bridges Praterstern von Kreuzung Franzensbrückenstraße bis Kreuzung Hauptallee works on a special structure
    794 m Under construction · works since 14 September 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Wittelsbachstraße von Kreuzung Schüttelstraße und Rotundenbrücke bis Kreuzung Böcklinstraße pipe laying
    808 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Wien 2., Wittelsbachstr. v. Rotundenbrücke b. Böcklinstraße u. 3., Plateau Rasumofskyg. / Rotundenbrücke / Weißgerberlände - Erd- u. Baumeisterarbeiten
    817 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. award published (IFG)
    2. award published (IFG)
  • Roads and bridges (ProVia-ID 140655) SBW-St; Bau; Baumeisterarbeiten Wien Mitte - Baumeisterarbeiten Wien Mitte - Praterstern (M14,16,17,20,21,22,32,33,38)
    850 m Contract awarded 31 May 2026 Source: TED (EU tenders), Kerndaten (public tenders) · 11 records · checked 15 October 2026· Found automatically. Check with the source.
    History (11)
    1. award published (Kerndaten)
    2. award published (TED 375124-2026)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. tender published (Kerndaten)
    7. tender published (Kerndaten)
    8. tender published (Kerndaten)
  • Building 1020 Wien, Wittelsbachstraße 5, Thermische Sanierung inkl. Dekabonisierung, Bundes-Blindeninstitut, Baumeister Teil-GU
    861 m Contract awarded 25 September 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
  • Building 1010 Wien, Postgasse 7-9/Bäckerstraße 20 - Baumeisterarbeiten
    876 m Contract awarded 22 July 2026 Source: Kerndaten (public tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
    History (9)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 60–64 dB, rail 70–74 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Radetzkyplatz, 2 min walk, every 3 min
Frequent service (every 10 min or more often)
Wien Radetzkyplatz, 2 min walk, every 3 min

On foot

Supermarket
2 min
Pharmacy
2 min
Doctor's practice
1 min
Crèche
3 min
Kindergarten
2 min
Primary school
1 min
Middle school
13 min
Playground
1 min

Green and air

Green and open land within 300 m
1 %
Nearest park
Herrmannpark, 4 min walk
Nearest forest
unnamed, 11 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.7 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
5,335 · more densely populated than most of Vienna
Who lives in the neighbourhood
fewer children

Prices

Apartments, average €/m² by building age
€ 4,538–5,655 (the Landstraße district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →