Your address

Kremsergasse 7

1130 Wien · 13. Hietzing

The outline marks the neighbourhood St.-Veit-Gasse area, with 126 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Fair · better than 58 % of all addresses in Vienna

The neighbourhood

St.-Veit-Gasse area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 87 7587
LAir quality 42 4246
APublic transport 100 10090
GGreen space 39 3653
GNatural hazards 100 100100
EEveryday amenities 96 9697

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
40 % of addresses
Free of mapped noise ≥ 55 dB at the building
2 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
5 %
Distance to the nearest park or forest (average)
282 m
Protection zone (Schutzzone)
37 %
Residents
1,612 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

1 project reaches this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works
    349 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)
    368 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Roads and bridges (ProVia-ID 131281) Attraktivierung der Verbindungsbahn; Baumeisterarbeiten Baulos Mitte
    467 m Contract awarded · contract period 8 September 2025 – 10 May 2030 Source: TED (EU tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
    History (8)
    1. tender published (TED 128478-2025)
    2. tender published (TED 227365-2025)
    3. award published (TED 542988-2025)
    4. tender published (TED 56300-2026)
    5. tender published (TED 77108-2026)
    6. tender published (TED 183076-2026)
    7. tender published (TED 211874-2026)
    8. award published (TED 592567-2026)
  • Pipes and cables Hietzinger Kai Kreuzung Braunschweiggasse water main works
    581 m Under construction · works since 11 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Hietzinger Kai Kreuzung Hietzinger Kai und Braunschweiggasse sewer works
    581 m Under construction · works since 29 July 2026, planned until 13 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Wien 13., Lainzer Straße von Altgasse bis Stadlergasse - Wasserrohrauswechslungen - Generalunternehmer
    588 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Gleissanierungsoffensive Lainzer Straße 2-94, 1130 Wien, Gleisbau (Wiener Linien) und Straßenbau (MA 28)
    593 m Tendered · contract period 22 February 2027 – 22 December 2027 Source: TED (EU tenders) · checked 16 October 2026· Found automatically. Check with the source.
  • Pipes and cables Lainzer Straße von Hietzinger Hauptstraße und Altgasse bis Stadlergasse pipe laying
    602 m Under construction · works since 24 August 2026, planned until 26 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables V15 Wientalquerung Düker 1. HL, 13., Preindlgasse 35
    821 m Tendered · contract period 20 July 2026 – 20 December 2026 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Zoning change Hackinger Straße
    952 m Zoning in progress · building freeze since 7 May 2025 Source: Stadt Wien · checked 16 October 2026
  • Building Stadt Wien - Wiener Wohnen - 13., Trazerberggasse 66-68 - Baumeister
    967 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Building Bildungsdirektion für Wien - Teil-Generalunternehmerarbeiten für WC-Gruppen Sanierung in 1140 Wien, Linzerstraße 146
    974 m Contract awarded 8 June 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 55–59 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Fichtnergasse, 3 min walk, every 9 min
Frequent service (every 10 min or more often)
Wien Fichtnergasse, 3 min walk, every 9 min

On foot

Supermarket
5 min
Pharmacy
2 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
2 min
Primary school
4 min
Middle school
17 min
Playground
5 min

Green and air

Green and open land within 300 m
6 %
Nearest park
Hügelpark, 4 min walk
Nearest forest
unnamed, 10 min walk
NO₂ / PM2.5, modelled 2022
27.4 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
2,440 · about as densely populated as most of Vienna
Who lives in the neighbourhood
fewer people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 4,100–5,905 (the Hietzing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →