Your address
Kundmanngasse 2
1030 Wien · 3. Landstraße
The LAGE score
This building
Weak · better than 13 % of all addresses in Vienna
The neighbourhood
Kundmanngasse area · Modest · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 17 | 39 | 87 |
| LAir quality | 29 | 29 | 46 |
| APublic transport | 100 | 100 | 90 |
| GGreen space | 44 | 37 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 65 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 100 %
- Green & open land within 300 m (average)
- 11 %
- Distance to the nearest park or forest (average)
- 478 m
- Protection zone (Schutzzone)
- 28 %
- Residents
- 1,206 · more densely populated than most of Vienna
Building works and projects nearby
1 project reaches this address. 12 more projects within 1 km.
Works and changes that reach this address
-
Pipes and cables Rotundenbrücke von Kreuzung Schüttelstraße und Wittelsbachstraße bis Kreuzung Erdberger Lände und We pipe laying55 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
Further away, within 1 km (12)
-
Pipes and cables Wittelsbachstraße von Kreuzung Schüttelstraße und Rotundenbrücke bis Kreuzung Böcklinstraße pipe laying172 m Under construction · works since 14 September 2026, planned until 31 January 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Wien 2., Wittelsbachstr. v. Rotundenbrücke b. Böcklinstraße u. 3., Plateau Rasumofskyg. / Rotundenbrücke / Weißgerberlände - Erd- u. Baumeisterarbeiten198 m Contract awarded 17 August 2026 Source: data.gv.at (information requests) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (IFG)
- award published (IFG)
-
Building 1020 Wien Böcklinstraße 1- Dekarbonisierung Raus aus Gas Baumeisterarbeiten_Teil-GU226 m Contract awarded 30 June 2025 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1020 Wien, Wittelsbachstraße 5, Thermische Sanierung inkl. Dekabonisierung, Bundes-Blindeninstitut, Baumeister Teil-GU266 m Contract awarded 25 September 2026 Source: Kerndaten (public tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building Stadt Wien - Wiener Wohnen - 03., Lorbeergasse 6- Baumeister553 m Contract awarded 23 July 2025 Source: Kerndaten (public tenders) · 6 records · checked 10 October 2026· Found automatically. Check with the source.
History (6)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
-
Building 1030 Wien, Hetzgasse 2, Fassadensanierung - Baumeisterarbeiten und WDVS769 m Tendered 14 October 2026 Source: Kerndaten (public tenders) · checked 15 October 2026· Found automatically. Check with the source.
-
Roads and bridges Schüttelstraße von 9 bis 3 works on a special structure827 m Under construction · works since 14 September 2026, planned until 15 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Große Ungarbrücke von Kreuzung Rechte Bahngasse und Am Heumarkt und Am Stadtpark bis Kreuzung Ungarg bridge works848 m Under construction · works since 16 August 2026, planned until 31 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables (ProVia-ID 146380) Schnellbahn Wien AMU210; HF Montagen Tunnelfunk Wiener Schnellbahn Stammstrecke (Wien HBF-Wien Mitte-St.Marx)851 m Contract awarded · contract period 1 September 2026 – 31 December 2027 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
-
Building A23 Südosttangente Wien, GE Kn Prater - ASt Handelskai, km 10,596 - km 12,287905 m Contract awarded · contract period 8 July 2024 – 31 October 2031 Source: TED (EU tenders) · 24 records · checked 10 October 2026· Found automatically. Check with the source.
History (24)
- award published (TED 197646-2026)
- award published (TED 204964-2026)
- award published (TED 218285-2026)
- award published (TED 239657-2026)
- award published (TED 287541-2026)
- award published (TED 411646-2026)
- award published (TED 524521-2026)
- award published (TED 644329-2026)
-
Public transport Vordere Zollamtsstraße von Marxergasse und Kleine Marxerbrücke bis Unbenannte Verkehrsfläche und Rad track works916 m Under construction · works since 1 February 2026, planned until 30 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges Landstraßer Hauptstraße von Emmerich-Teuber-Platz und Juchgasse und Apostelgasse bis Schlachthausgas road works980 m Under construction · works since 9 March 2026, planned until 31 August 2027 Source: Stadt Wien, TED (EU tenders) · 9 records · checked 16 October 2026
History (3)
- tender published (TED 760400-2025)
- award published (TED 94160-2026)
- listed by the city
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 60–64 dB
- Quiet side
- yes
Getting around
- Public transport class
- A
- Nearest stop
- Wien Löwengasse, 1 min walk, every 5 min
- Frequent service (every 10 min or more often)
- Wien Löwengasse, 1 min walk, every 5 min
On foot
- Supermarket
- 1 min
- Pharmacy
- 3 min
- Doctor's practice
- 1 min
- Crèche
- 2 min
- Kindergarten
- 1 min
- Primary school
- 4 min
- Middle school
- 3 min
- Playground
- 6 min
Green and air
- Green and open land within 300 m
- 12 %
- Nearest park
- Prater, 6 min walk
- Nearest forest
- unnamed, 6 min walk
- NO₂ / PM2.5, modelled 2022
- 31.2 / 11.7 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 5,447 · more densely populated than most of Vienna
- Who lives in the neighbourhood
- fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 4,538–5,655 (the Landstraße district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →