Your address

Kunzgasse 9

1200 Wien · 20. Brigittenau

The outline marks the neighbourhood Rauscherstraße area, with 35 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 17 % of all addresses in Vienna

The neighbourhood

Rauscherstraße area · Fair · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 3987
LAir quality 29 2946
APublic transport 90 9090
GGreen space 63 7353
GNatural hazards 100 100100
EEveryday amenities 100 10097

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
74 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
25 %
Distance to the nearest park or forest (average)
109 m
Protection zone (Schutzzone)
51 %
Residents
795 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

3 projects reach this address. 12 more projects within 1 km.

Works and changes that reach this address

Further away, within 1 km (12)
  • Building Generalunternehmervertrag: 20., Wallensteinstraße 68-72
    209 m Tendered · contract period 1 March 2027 – 31 August 2029 Source: TED (EU tenders) · checked 10 October 2026· Found automatically. Check with the source.
  • Public transport Linie 12: Stufe 2 Nordwestbahnhof
    242 m Planned Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building 1200 Wien, Unterbergergasse 1, Sanierung WCs - Baumeister / Ausbau
    268 m Contract awarded 6 July 2026 Source: Kerndaten (public tenders) · 23 records · checked 10 October 2026· Found automatically. Check with the source.
    History (23)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
    6. award published (Kerndaten)
    7. award published (Kerndaten)
    8. award published (Kerndaten)
  • Building BAUI.IM6009: Technische Freimachung Wien Nordwestbahnhof - Abbrucharbeiten
    439 m Contract awarded 28 September 2026 Source: Kerndaten (public tenders) · 4 records · checked 12 October 2026· Found automatically. Check with the source.
    History (4)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
  • Building PPP-Projekt Bildungscampus Nordwestbahnhof (BC NWBHF Planung, Errichtung, Finanzierung und Verfügbarhaltung) Adresse: 20., Rebhanngasse
    439 m Contract awarded · since 1 June 2026 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 587888-2024)
    2. award published (TED 326240-2026)
  • Building Heizung, Klimatechnik, Lüftung und Sanitär
    535 m Tendered · contract period 30 March 2026 – 28 June 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 629712-2025)
    2. tender published (TED 701861-2025)
    3. tender published (TED 705095-2025)
  • New quarter 20., Nordwestbahnhof – Phase A.1
    541 m Planned · developer competition 2025 · 520 flats Source: Stadt Wien · checked 16 October 2026
  • Building 20., Nordwestbahnhof – Phase A.2
    556 m Tendered · 100 flats Source: Stadt Wien · checked 16 October 2026
  • Roads and bridges (ProVia-ID 116375) Technische Freimachung Wien Nordwestbahnhof; Abbrucharbeiten
    590 m Contract awarded · contract period 2 September 2024 – 1 September 2028 Source: TED (EU tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
    History (2)
    1. tender published (TED 281451-2024)
    2. award published (TED 492315-2024)
  • Zoning change Plandokument 8461: Gebiet zwischen Innstraße (Bezirksgrenze), Linienzug 1-2 (Trasse ÖBB Nordbahn), Linienzug 2-3, Nordbahnstraße (Bezirksgrenze) und Dresdner St
    593 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Pipes and cables Donaueschingenstraße von Dresdner Straße bis Leystraße pipe laying
    632 m Under construction · works since 31 May 2026, planned until 30 October 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Nordbahnhof-Innstraße
    657 m Zoning in progress · draft on public display 12 August 2026 – 23 September 2026; building freeze until 12 March 2027 Source: Stadt Wien · 2 records · checked 16 October 2026
    History (2)
    1. building freeze announced
    2. procedure stage: Nach öffentlicher Auflage

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB
Quiet side
yes

Getting around

Public transport class
B
Nearest stop
Wien Wasnergasse, 3 min walk, every 10 min
Frequent service (every 10 min or more often)
Wien Wasnergasse, 3 min walk, every 10 min

On foot

Supermarket
2 min
Pharmacy
4 min
Doctor's practice
3 min
Crèche
3 min
Kindergarten
3 min
Primary school
3 min
Middle school
3 min
Playground
5 min

Green and air

Green and open land within 300 m
20 %
Nearest park
Augarten, 2 min walk
Nearest forest
unnamed, 3 min walk
NO₂ / PM2.5, modelled 2022
31.2 / 11.6 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
outside mapped flood areas
Zoning
core / mixed use
Protection zones
old-town zone

Residents

Residents within 300 m
2,653 · about as densely populated as most of Vienna
Who lives in the neighbourhood
younger residents than in most of Vienna; fewer older people

Prices

Apartments, average €/m² by building age
€ 3,569–5,058 (the Brigittenau district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →