Your address
Larochegasse 15
1130 Wien · 13. Hietzing
The LAGE score
This building
Fair · better than 58 % of all addresses in Vienna
The neighbourhood
Lainzer Straße / Franz-Schalk-Platz area · Fair · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 87 | 67 | 87 |
| LAir quality | 40 | 37 | 46 |
| APublic transport | 78 | 90 | 90 |
| GGreen space | 49 | 79 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 100 | 97 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 45 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 17 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 66 %
- Green & open land within 300 m (average)
- 28 %
- Distance to the nearest park or forest (average)
- 58 m
- Protection zone (Schutzzone)
- 88 %
- Residents
- 770 · about as densely populated as most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Public transport Gleissanierungsoffensive Lainzer Straße 2-94, 1130 Wien, Gleisbau (Wiener Linien) und Straßenbau (MA 28)169 m Tendered · contract period 22 February 2027 – 22 December 2027 Source: TED (EU tenders) · checked 16 October 2026· Found automatically. Check with the source.
-
Pipes and cables Wien 13., Lainzer Straße von Altgasse bis Stadlergasse - Wasserrohrauswechslungen - Generalunternehmer174 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
-
Pipes and cables Lainzer Straße von Hietzinger Hauptstraße und Altgasse bis Stadlergasse pipe laying179 m Under construction · works since 24 August 2026, planned until 26 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Zoning change Plandokument 8436: Gebiet zwischen Hietzinger Kai, Fleschgasse, Auhofstraße und St.-Veit-Gasse321 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
-
Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)516 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
-
Roads and bridges (ProVia-ID 131281) Attraktivierung der Verbindungsbahn; Baumeisterarbeiten Baulos Mitte642 m Contract awarded · contract period 8 September 2025 – 10 May 2030 Source: TED (EU tenders) · 8 records · checked 10 October 2026· Found automatically. Check with the source.
History (8)
- tender published (TED 128478-2025)
- tender published (TED 227365-2025)
- award published (TED 542988-2025)
- tender published (TED 56300-2026)
- tender published (TED 77108-2026)
- tender published (TED 183076-2026)
- tender published (TED 211874-2026)
- award published (TED 592567-2026)
-
Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works745 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Hietzinger Kai Kreuzung Braunschweiggasse water main works748 m Under construction · works since 11 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Pipes and cables Hietzinger Kai Kreuzung Hietzinger Kai und Braunschweiggasse sewer works748 m Under construction · works since 29 July 2026, planned until 13 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges 13., Maxingstraße857 m Contract awarded · contract period 18 August 2026 – 11 December 2026 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 382013-2026)
- tender published (TED 446202-2026)
- award published (TED 597931-2026)
-
Pipes and cables Maxingstraße von Kreuzung Hanselmayergasse bis Kreuzung Trauttmansdorffgasse pipe laying874 m Under construction · works since 6 April 2026, planned until 31 December 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Building Stadt Wien - Wiener Wohnen - 13., Trazerberggasse 66-68 - Baumeister989 m Contract awarded 8 January 2025 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 55–59 dB
- Quiet side
- yes
Getting around
- Public transport class
- C
- Nearest stop
- Wien Gloriettegasse, 5 min walk, every 6 min
- Frequent service (every 10 min or more often)
- Wien Gloriettegasse, 5 min walk, every 6 min
On foot
- Supermarket
- 8 min
- Pharmacy
- 6 min
- Doctor's practice
- 2 min
- Crèche
- 2 min
- Kindergarten
- 2 min
- Primary school
- 10 min
- Middle school
- 12 min
- Playground
- 2 min
Green and air
- Green and open land within 300 m
- 7 %
- Nearest park
- Hügelpark, 1 min walk
- Nearest forest
- unnamed, 3 min walk
- NO₂ / PM2.5, modelled 2022
- 27.9 / 11.2 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- residential
- Protection zones
- old-town zone
Residents
- Residents within 300 m
- 1,501 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- older residents than in most of Vienna; more older people; fewer people between 15 and 29
Prices
- Apartments, average €/m² by building age
- € 4,100–5,905 (the Hietzing district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →