Your address
Leberstraße 18
1110 Wien · 11. Simmering
The LAGE score
This building
Weak · better than 2 % of all addresses in Vienna
The neighbourhood
Brehmstraße area · Weak · Vienna average: 65.
| Score | This building | Neighbourhood | Vienna |
|---|---|---|---|
| LQuietness | 5 | 17 | 87 |
| LAir quality | 32 | 32 | 46 |
| APublic transport | 78 | 100 | 90 |
| GGreen space | 32 | 33 | 53 |
| GNatural hazards | 100 | 100 | 100 |
| EEveryday amenities | 99 | 100 | 97 |
0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.
LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →
Set your priorities to see your own LAGE for this building →
The neighbourhood in figures
- Loud road facade (≥ 65 dB Lden)
- 68 % of addresses
- Free of mapped noise ≥ 55 dB at the building
- 0 %
- Inside a 30- or 100-year flood area
- 0 %
- Public transport class A or B
- 90 %
- Green & open land within 300 m (average)
- 4 %
- Distance to the nearest park or forest (average)
- 349 m
- Residents
- 1,821 · about as densely populated as most of Vienna
Building works and projects nearby
This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.
Further away, within 1 km (12)
-
Roads and bridges Simmeringer Hauptstraße von Litfaßstraße bis Zippererstraße road works168 m Under construction · works since 18 May 2026, planned until 28 May 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
-
Roads and bridges 11., Simmeringer Hauptstraße v. Litfaßstr. b. Zippererstr.342 m Contract awarded · contract period 19 May 2026 – 19 May 2027 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
History (3)
- tender published (TED 142501-2026)
- tender published (TED 213718-2026)
- award published (TED 352920-2026)
-
Building 1110 Wien, Molitorgasse 15 / Dopplergasse 2 – Thermische Wohnhaussanierung – Baumeisterarbeiten448 m Tendered · contract period 1 November 2026 – 2 November 2029 Source: TED (EU tenders) · 9 records · checked 10 October 2026· Found automatically. Check with the source.
History (9)
- tender published (TED 493514-2026)
- tender published (TED 493614-2026)
- tender published (TED 493720-2026)
- tender published (TED 493761-2026)
- tender published (TED 567796-2026)
- tender published (TED 571047-2026)
- tender published (TED 586114-2026)
- tender published (TED 599936-2026)
-
Roads and bridges 1030 Wien, Franz Grill Straße 4- Abbruch Schlot sowie Herstellung der Oberflächen und Gartengestaltung im Bereich der Abbruchstelle484 m Contract awarded 30 September 2026 Source: Kerndaten (public tenders) · 10 records · checked 15 October 2026· Found automatically. Check with the source.
History (10)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- award published (Kerndaten)
- tender published (Kerndaten)
-
Building 1030 Wien, Franz-Grill-Staße 1A-E, AKBILD - ZMKK - Fassadenkonstruktion484 m Contract awarded · contract period 20 July 2026 – 31 December 2027 · end moved 72 days later since first listed Source: TED (EU tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 359329-2026)
- tender published (TED 657362-2026)
- tender published (TED 659363-2026)
- tender published (TED 659957-2026)
- award published (TED 672051-2026)
-
Zoning change Plandokument 8460: Gebiet zwischen Leberstraße, Grillgasse, Linienzug 1-2 (Werkstättenweg), Hauffgasse, Linienzug 3-7 und Geiselbergstraße633 m Zoning in progress 18 May 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
Building ENK2 | Totalunternehmer für die SANIERUNG UND PLANUNG NMS I+II Enkplatz, 1110 Wien777 m Contract awarded 25 January 2026 Source: Kerndaten (public tenders) · 2 records · checked 10 October 2026· Found automatically. Check with the source.
History (2)
- award published (Kerndaten)
- award published (Kerndaten)
-
New quarter Gasometervorfeld UNIQA Döblerhofstraße 10A779 m Approved 2024 Source: Stadt Wien · checked 16 October 2026
-
Zoning change Plandokument 8443: Gebiet zwischen Ghegastraße, Bezirksgrenze, Lilienthalgasse, Linienzug 1-2, unbenannte Verkehrsfläche (06606), unbenannte Verkehrsfläche (066795 m Zoning in progress 16 January 2026 Source: data.gv.at (information requests) · checked 10 October 2026
-
New quarter Hallergasse819 m Approved 2019 Source: Stadt Wien · checked 16 October 2026
-
New quarter Gasometervorfeld EBG Hallergasse819 m Approved 2024 Source: Stadt Wien · checked 16 October 2026
-
Pipes and cables Wien 3., Landstraßer Hauptstraße von Schlachthausgasse bis Juchgasse - Wasserrohrauswechslung - Rohrlegerarbeiten878 m Contract awarded · contract period 28 April 2026 – 13 April 2027 Source: TED (EU tenders), Kerndaten (public tenders), data.gv.at (information requests) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
History (5)
- tender published (TED 140941-2026)
- tender published (TED 141271-2026)
- award published (IFG)
- award published (Kerndaten)
- award published (Kerndaten)
From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.
All projects in Vienna → Know of a project that is missing? Tell us
The address in figures
Noise
- Loudest facade (day–evening–night level)
- road 70–74 dB, rail 70–74 dB
- Quiet side
- no
Getting around
- Public transport class
- C
- Nearest stop
- Wien Molitorgasse, 3 min walk, every 7 min
- Frequent service (every 10 min or more often)
- Wien Molitorgasse, 3 min walk, every 7 min
On foot
- Supermarket
- 4 min
- Pharmacy
- 7 min
- Doctor's practice
- 6 min
- Crèche
- 3 min
- Kindergarten
- 3 min
- Primary school
- 5 min
- Middle school
- 6 min
- Playground
- 4 min
Green and air
- Green and open land within 300 m
- 4 %
- Nearest park
- Hyblerpark, 5 min walk
- Nearest forest
- –
- NO₂ / PM2.5, modelled 2022
- 30.5 / 11.3 µg/m³
- Heat days per year, now → around 2050
- –
Hazards and rules
- Flooding
- outside mapped flood areas
- Zoning
- industrial
- Protection zones
- outside all zones
Residents
- Residents within 300 m
- 3,176 · about as densely populated as most of Vienna
- Who lives in the neighbourhood
- younger residents than in most of Vienna; fewer older people
Prices
- Apartments, average €/m² by building age
- € 3,048–3,606 (the Simmering district)
The full report explains every figure, chapter by chapter, with what to check before you sign →
Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →