Your address

Leegasse 2

1140 Wien · 14. Penzing

The outline marks the neighbourhood Penzinger Straße / Leegasse area, with 36 addresses.worksplannedzoning change · projects nearby

The LAGE score

This building

Weak · better than 4 % of all addresses in Vienna

The neighbourhood

Penzinger Straße / Leegasse area · Weak · Vienna average: 65.

ScoreThis buildingNeighbourhoodVienna
LQuietness 17 2887
LAir quality 24 2446
APublic transport 100 10090
GGreen space 27 3053
GNatural hazards 85 85100
EEveryday amenities 95 9597

0–100, higher is better. The neighbourhood and city columns show the average score of all their addresses, scored with the same rules.

LAGE stands for Lärm & Luft (noise & air) · Anbindung (transport links) · Grün & Gefahren (green & hazards) · Erledigungen (everyday errands). How it is calculated →

Set your priorities to see your own LAGE for this building →

The neighbourhood in figures

Loud road facade (≥ 65 dB Lden)
56 % of addresses
Free of mapped noise ≥ 55 dB at the building
0 %
Inside a 30- or 100-year flood area
0 %
Public transport class A or B
100 %
Green & open land within 300 m (average)
4 %
Distance to the nearest park or forest (average)
398 m
Protection zone (Schutzzone)
31 %
Residents
969 · about as densely populated as most of Vienna
The neighbourhood report →

Building works and projects nearby

This address lies beyond the reach of every construction site, zoning change and planned line. 12 more projects within 1 km.

Further away, within 1 km (12)
  • Pipes and cables Hietzinger Kai Kreuzung Braunschweiggasse water main works
    177 m Under construction · works since 11 October 2026, planned until 27 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables Hietzinger Kai Kreuzung Hietzinger Kai und Braunschweiggasse sewer works
    177 m Under construction · works since 29 July 2026, planned until 13 November 2026 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Zoning change Plandokument 8436: Gebiet zwischen Hietzinger Kai, Fleschgasse, Auhofstraße und St.-Veit-Gasse
    233 m Zoning in progress 25 November 2025 Source: data.gv.at (information requests) · checked 10 October 2026
  • Public transport Attraktivierung der Verbindungsbahn (ÖBB-Strecke 12201 Wien Hütteldorf - Wien Praterstern, ÖBB-Strecke 12101 Wien Penzing - Abzweigung Hütteldorf, ÖBB-Strecke 10615 Wien Maxing - Wien Matzleinsdorf-Altmannsdorf)
    271 m Approval pending Source: Umweltbundesamt (environmental impact assessment) · checked 16 October 2026 · route © OpenStreetMap contributors
  • Pipes and cables Hadikgasse von ggü. 162 bis ggü. 172 sewer works
    286 m Under construction · works since 22 June 2025, planned until 31 December 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Building Bildungsdirektion für Wien - Teil-Generalunternehmerarbeiten für WC-Gruppen Sanierung in 1140 Wien, Linzerstraße 146
    501 m Contract awarded 8 June 2026 Source: Kerndaten (public tenders) · 5 records · checked 10 October 2026· Found automatically. Check with the source.
    History (5)
    1. award published (Kerndaten)
    2. award published (Kerndaten)
    3. award published (Kerndaten)
    4. award published (Kerndaten)
    5. award published (Kerndaten)
  • Public transport Gleissanierungsoffensive Lainzer Straße 2-94, 1130 Wien, Gleisbau (Wiener Linien) und Straßenbau (MA 28)
    580 m Tendered · contract period 22 February 2027 – 22 December 2027 Source: TED (EU tenders) · checked 16 October 2026· Found automatically. Check with the source.
  • Pipes and cables Wien 13., Lainzer Straße von Altgasse bis Stadlergasse - Wasserrohrauswechslungen - Generalunternehmer
    607 m Contract awarded 10 September 2026 Source: data.gv.at (information requests) · checked 10 October 2026· Found automatically. Check with the source.
  • Pipes and cables Lainzer Straße von Hietzinger Hauptstraße und Altgasse bis Stadlergasse pipe laying
    614 m Under construction · works since 24 August 2026, planned until 26 March 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Pipes and cables 14., Hadikgasse von Kennedybrücke bis Einwanggasse sewer works
    655 m Under construction · works since 10 June 2025, planned until 2 July 2027 Source: Stadt Wien · 7 records · checked 16 October 2026
  • Roads and bridges 13., Maxingstraße
    814 m Contract awarded · contract period 18 August 2026 – 11 December 2026 Source: TED (EU tenders) · 3 records · checked 10 October 2026· Found automatically. Check with the source.
    History (3)
    1. tender published (TED 382013-2026)
    2. tender published (TED 446202-2026)
    3. award published (TED 597931-2026)
  • New quarter Cumberlandstraße 38
    822 m Approved 2018 Source: Stadt Wien · checked 16 October 2026

From the City of Vienna (construction sites that affect traffic, zoning procedures, building freezes, planned U-Bahn, tram and major roads), public tenders, the Freedom of Information register and environmental impact assessments. We have recorded these sources every day since 10 October 2026. A moved end date shows as a delay. Private building sites appear only where they affect traffic or were tendered publicly.

The address in figures

Noise

Loudest facade (day–evening–night level)
road 70–74 dB, rail 60–64 dB
Quiet side
yes

Getting around

Public transport class
A
Nearest stop
Wien Braunschweiggasse, 3 min walk, every 4 min
Frequent service (every 10 min or more often)
Wien Braunschweiggasse, 3 min walk, every 4 min

On foot

Supermarket
2 min
Pharmacy
6 min
Doctor's practice
2 min
Crèche
2 min
Kindergarten
2 min
Primary school
10 min
Middle school
23 min
Playground
2 min

Green and air

Green and open land within 300 m
3 %
Nearest park
unnamed, 7 min walk
Nearest forest
unnamed, 14 min walk
NO₂ / PM2.5, modelled 2022
32.8 / 10.5 µg/m³
Heat days per year, now → around 2050
–

Hazards and rules

Flooding
within 50 m of a flood area
Zoning
residential
Protection zones
outside all zones

Residents

Residents within 300 m
3,976 · more densely populated than most of Vienna
Who lives in the neighbourhood
more older people; fewer people between 15 and 29

Prices

Apartments, average €/m² by building age
€ 3,694–5,796 (the Penzing district)

The full report explains every figure, chapter by chapter, with what to check before you sign →

Sources: BEV cadastre and address register, Stadt Wien OGD (zoning, flood and protection zones, facility registers), BMLUK noise and flood maps, WLV hazard zones, ÖROK ÖV-Güteklassen 2025, European Environment Agency, Statistik Austria, © OpenStreetMap contributors. CC BY 4.0 / ODbL. Lagecheck processed the data. All sources and licences →